Steel Express

From Wikipedia, the free encyclopedia

Steel Express
Steel Exp.jpg
Overview
Service typeExpress
LocaleWest Bengal & Jharkhand
First service1 April 1970; 51 years ago (1970-04-01)
Current operator(s)South Eastern Railways
Route
StartHowrah (HWH)
Stops6 as 12814
5 as 12813
EndTatanagar (TATA)
Distance travelled250 km (155 mi)
Average journey time4 hours (approx.)
Service frequencyDaily
Train number(s)12813 / 12814
On-board services
Class(es)AC Executive Chair Car, AC Chair, 2nd Sitting
Seating arrangementsYes
Sleeping arrangementsNo
Catering facilitiesOn-board catering,
E-catering
Observation facilitiesLarge windows
Other facilitiesBelow the seats
Technical
Rolling stockLHB coaches
Track gauge1,676 mm (5 ft 6 in)
Operating speed62 km/h (39 mph) average including halts
Route map
Steel Express (Howrah–Tatanagar) route map

The 12813 / 12814 Steel Express is a Superfast class train operated by Indian Railways connecting Kolkata with the steel-producing city Jamshedpur in Jharkhand state. The Steel Express[1] covers 250 kilometres (160 mi) at an average speed of 61 kilometres per hour (38 mph).

It has a Single Dedicated Rake whose Primary Maintenance is done at Tatanagar coaching depot.

Rake[]

Second-class sitting, AC chair car, AC Executive, and General type of coaches are available in it. This train has an advanced reservation period of 30 days. It is running with LHB coaches from 11 June 2018.

Route & halts[]

Traction[]

It is hauled by a Tatanagar / Santragachi-based WAP-7 locomotive from end to end.

Time Table[]

From Tatanagar to Howrah- 12814. The train starts from Tatanagar every day

Station code Station name Arrival Departure
TATA Tatanagar Jn Starting station 06:10
RHE Rakha Mines 06:31 06:33
GTS Ghatsila Jn 06:47 06:49
CKU Chakulia Jn 07:11 07:13
JGM Jhargram 07:35 07:37
KGP Kharagpur Jn 08:20 08:22
SRC Santragachi Jn 09:40 09:42
HWH Howrah 10:20 Destination station

From Howrah to Tatanagar – 12813. The train starts from Howrah every day.

Station code Station name Arrival Departure
HWH Howrah Starting station 17:25
KGP Kharagpur Jn 19:00 19:02
JGM Jhargram 19:36 19:38
CKU Chakulia Jn 19:59 20:01
GTS Ghatsila Jn 20:22 20:24
RHE Rakha Mines 20:50 20:52
TATA Tatanagar Jn Destination station 21:25

External links[]

References[]

  1. ^ "Welcome to Indian Railway Passenger reservation Enquiry". indianrail.gov.in. Retrieved 30 May 2014.


Retrieved from ""