Artemis 3
Names | Exploration Mission-3 (2017–2019) |
---|---|
Mission type | Crewed lunar landing |
Operator | NASA |
Mission duration | ~30 days [1] |
Spacecraft properties | |
Spacecraft | Orion 004 Starship HLS |
Manufacturer | |
Start of mission | |
Launch date | 2025 (planned) [4] |
Rocket | SLS Block 1 (Orion) [5] |
Launch site | Kennedy Space Center, LC-39B |
Contractor | NASA |
End of mission | |
Landing site | Pacific Ocean (planned) |
Moon lander | |
Landing site | South polar region |
Artemis program |
Artemis 3 (officially Artemis III)[6] is the first crewed Moon landing mission of the Artemis program and the third planned flight of NASA's Orion spacecraft of the Space Launch System (SLS). Scheduled for launch in 2025, Artemis 3 is planned to be the second crewed Artemis mission and the first crewed lunar landing since Apollo 17 in 1972.[4]
Mission[]
Artemis 3 will land a crew at the Moon's south polar region.[7] It is planned to have two astronauts on the surface of the Moon for about one week.[8] The mission is intended to be the first to place a woman on the Moon.[9] While up to four astronauts would leave Earth on board Orion, the surface mission with the HLS (Human Landing System - see below) will consist of two crew members, who will remain on the surface for 6.5 days. The remaining astronauts will stay on board the Gateway / Orion orbital complex. The two astronauts will conduct up to four spacewalks on the Moon's surface, performing a variety of scientific observations, including sampling water ice. Before the Artemis 3 landing, some additional equipment will be pre-positioned on the surface, including an unpressurized rover for astronauts to use during their lunar excursions. This rover will have the capability to be controlled remotely. Several permanently shadowed regions could be reached by short forays of 5 to 15 km (3.1 to 9.3 mi), well within the range of the unpressurized rover.[10]
Spacecraft[]
Orion[]
Orion is the crew transport vehicle used by all Artemis missions. It will transport the crew from Earth to the Gateway orbit, and return them back to Earth.
SLS[]
The Space Launch System is a super-heavy-lift launcher used to launch the Orion spacecraft from Earth to a trans-lunar orbit.
Gateway[]
Gateway is a small modular space station to be established in Near-rectilinear halo orbit (NRHO) prior to the Artemis 3 mission. HLS and Orion will both dock to Gateway for crew transfer. To mitigate the effects of a possible schedule slip, the Artemis 3 mission does not depend on Gateway. If Gateway is unavailable, astronauts will transfer directly from Orion to HLS.
HLS[]
After a multi-phase design effort, on 16 April 2021, NASA selected SpaceX to develop Starship HLS and deliver it to the Gateway orbit for use on the Artemis 3 mission. Two astronauts will transfer from Orion to Starship HLS, which will descend to the lunar surface and sustain them for several days before returning them to Orion.
Development[]
Upon the December 2017 ratification of the Trump administration's Space Policy Directive 1, a crewed lunar campaign – later known as the Artemis program – utilising the Orion Multi-Purpose Crew Vehicle (MPCV) and a space station in lunar orbit was established. Originally billed as Exploration Mission-3 (EM-3), the goal of the mission was to send four astronauts into a near-rectilinear halo orbit around the Moon and deliver the ESPRIT and U.S. Utilization Module to the lunar space station, known as the Gateway.[11] By May 2019 however, ESPRIT and the U.S. Utilization Module – now called HALO – were re-manifested to fly separately on a commercial launch vehicle instead. Artemis 3, as it was now billed, was repurposed to accelerate the first crewed lunar landing of the Artemis program by the end of 2024, with a profile that would've seen the Orion MPCV rendezvous with a minimal Gateway made up of only the Power and Propulsion Element and a small habitat/docking node with an attached commercially-procured lunar lander known as the Human Landing System.[12]
By early 2020, plans for Orion and the HLS to rendezvous with the Gateway were abandoned in favour of a solo demonstration of Orion and HLS, and development of the Gateway independent of the Artemis program.[13][14]
On 10 August 2021, an Office of Inspector General audit reported a conclusion that the spacesuits would not be ready until April 2025 at the earliest, likely delaying the mission from the planned late 2024 launch date.[15]
On 9 November 2021, NASA Administrator Bill Nelson confirmed that Artemis III will take place no earlier than 2025.[4]
References[]
- ^ Gebhardt, Chris (22 September 2017). "SLS EM-1 and EM-2 launch dates realign; EM-3 gains notional mission outline". NASASpaceFlight.com. Archived from the original on 2 October 2017. Retrieved 23 September 2017.
- ^ Berger, Eric (16 April 2021). "NASA selects SpaceX as its sole provider for a lunar lander - "We looked at what's the best value to the government"". Ars Technica. Archived from the original on 17 April 2021. Retrieved 17 April 2021.
- ^ Brown, Katherine (16 April 2021). "As Artemis Moves Forward, NASA Picks SpaceX to Land Next Americans on Moon". NASA. Archived from the original on 16 April 2021. Retrieved 17 April 2021. This article incorporates text from this source, which is in the public domain.
- ^ a b c Foust, Jeff (9 November 2021). "NASA delays human lunar landing to at least 2025". SpaceNews. Retrieved 9 November 2021.
- ^ Loff, Sarah (16 October 2019). "NASA Commits to Future Artemis Missions With More SLS Rocket Stages". NASA. Archived from the original on 20 January 2021. Retrieved 16 October 2019. This article incorporates text from this source, which is in the public domain.
- ^ Artemis : brand book (Report). Washington, D.C.: NASA. 2019. NP-2019-07-2735-HQ.
MISSION NAMING CONVENTION. While Apollo mission patches used numbers and roman numerals throughout the program, Artemis mission names will use a roman numeral convention.
- ^ Chang, Kenneth (25 May 2019). "For Artemis Mission to Moon, NASA Seeks to Add Billions to Budget". The New York Times. Archived from the original on 25 May 2019. Retrieved 25 May 2019.
Under the NASA plan, a mission to land on the moon would take place during the third launch of the Space Launch System. Astronauts, including the first woman to walk on the moon, Mr. Bridenstine said, would first stop at the orbiting lunar outpost. They would then take a lander to the surface near its south pole, where frozen water exists within the craters.
- ^ Foust, Jeff (21 July 2019). "NASA outlines plans for lunar lander development through commercial partnerships". SpaceNews. Archived from the original on 1 October 2021. Retrieved 17 July 2020.
- ^ "NASA unveils schedule for 'Artemis' 2024 Moon mission". France24. 23 May 2019. Archived from the original on 1 December 2020. Retrieved 21 July 2019.
- ^ Berger, Eric (29 October 2019). "NASA shares details of lunar surface missions—and they're pretty cool". Ars Technica. Archived from the original on 30 March 2021. Retrieved 17 July 2020.
- ^ Sloss, Philip (4 December 2017). "NASA evaluates EM-2 launch options for Deep Space Gateway PPE". NASASpaceFlight.com. Archived from the original on 9 August 2019. Retrieved 2 March 2018.
- ^ Grush, Loren (17 May 2019). "NASA administrator on new Moon plan: "We're doing this in a way that's never been done before"". The Verge. Archived from the original on 4 July 2020. Retrieved 17 July 2020.
- ^ Gohd, Chelsea (16 March 2020). "NASA's "critical path" to the Moon no longer requires a lunar Gateway: Report". Space.com. Archived from the original on 16 May 2020. Retrieved 16 May 2020.
NASA has removed the Lunar Gateway from its "critical path" to return humans to the Moon by 2024, according to a SpaceNews report.
- ^ Foust, Jeff (14 May 2020). "NASA refines plans for launching Gateway and other Artemis elements". SpaceNews. Archived from the original on 16 May 2020. Retrieved 16 May 2020.
... Loverro reiterated previous statements that the Gateway will not be used for the Artemis 3 mission that will attempt to land humans on the Moon to "make that mission have a higher probability of success"
- ^ "NASA's development of next-generation spacesuits" (PDF). 10 August 2021. Archived (PDF) from the original on 10 August 2021. Retrieved 10 August 2021.
... the suits would not be ready for flight until April 2025 at the earliest ... a lunar landing in late 2024 as NASA currently plans is not feasible.
External links[]
- Orion website at nasa.gov
- Space Launch System website at nasa.gov
- 2025 in spaceflight
- Artemis program
- Crewed missions to the Moon
- Orion (spacecraft)
- Space Launch System
- 2025 in the United States
- Missions to the Moon
- Crewed spacecraft
- Future human spaceflights
- Lunar Gateway