Bandra Terminus–Saharsa Humsafar Express
Overview | |
---|---|
Service type | Humsafar Express |
First service | 13 August 2017 |
Current operator(s) | Western Railways |
Route | |
Start | Bandra Terminus (BDTS) |
Stops | 14 |
End | Saharsa Junction (SHC) |
Distance travelled | 2,060 km (1,280 mi) |
Average journey time | 39h 00m |
Service frequency | Weekly [a] |
Train number(s) | 22913 / 22914 |
On-board services | |
Class(es) | AC 3 tier |
Seating arrangements | Yes |
Sleeping arrangements | Yes |
Catering facilities | Available |
Observation facilities | Large windows |
Technical | |
Rolling stock | LHB Humsafar |
Track gauge | 1,676 mm (5 ft 6 in) |
Operating speed | 55 km/h (34 mph) |
The 22913 / 22914 Bandra Terminus - Saharsa Humsafar Express is an Humsafar Express train belonging to Western Railway zone that runs between Bandra Terminus and Saharsa Junction. It is currently being operated with 22913/22914 train numbers on a weekly basis. This train was previously running only up to Patna Junction but recently this train has been extended up to Saharsa Junction by the Ministry of Railways.
Coach Composition[]
The trains is completely 3-tier AC sleeper trains designed by Indian Railways with features of LED screen display to show information about stations, train speed etc. and will have announcement system as well, Vending machines for tea, coffee and milk, Bio toilets in compartments as well as CCTV cameras.
Service[]
The 22913/Bandra Terminus - Saharsa Humsafar Express has an average speed of 55 km/hr, and covers 2060 km in 39h 00m.[1]
The 22914/Saharsa - Bandra Terminus Humsafar Express has an average speed of 57 km/hr, and covers 2060 km in 38h 50m.[2]
Route & Halts[]
- Bandra Terminus
- Vapi
- Valsad
- Udhna Junction
- Nandurbar
- Bhusaval
- Itarsi Junction
- Jabalpur Junction
- Katni Junction
- Satna
- Allahabad Chheoki Junction
- Pt. DD Upadhyaya Jn. (Mughalsarai)
- Patna Junction
- Begusarai
- Khagaria Junction
- Saharsa Junction
Direction Reversal[]
Train reverses its direction 1 times:
Rake Sharing[]
The train shares its rake with 19043/19044 Bandra Terminus - Bhagat Ki Kothi Humsafar Express.
Traction[]
Both trains are hauled by a Vadodara Electric Loco Shed based WAP 5 locomotive between Bandra Terminus and Itarsi Junction. After Itarsi Junction, both trains are hauled by a Samastipur Diesel Loco Shed based WDM 3A locomotive up to Saharsa Junction and back.
See also[]
- Humsafar Express
- Bandra Terminus railway station
- Saharsa Junction railway station
Notes[]
- ^ Runs once in a week for every direction.
References[]
- ^ "22913/Bandra Terminus - Saharsa Humsafar Express". India Rail Info.
- ^ "22914/Saharsa - Bandra Terminus Humsafar Express". India Rail Info.
External links[]
- Humsafar Express trains
- Rail transport in Jharkhand
- Rail transport in Maharashtra
- Rail transport in Odisha
- Rail transport in Chhattisgarh
- Transport in Mumbai
- Transport in Patna
- Railway services introduced in 2017