D3 motorway (Czech Republic)

From Wikipedia, the free encyclopedia
D3 Motorway shield}}
D3 Motorway
Dálnice D3
Route information
Part of European route E55
Length70 km (43 mi)
Planned: 172 km (107 mi)
Major junctions
FromCZ traffic sign IS16a - D0.svg D0 in Prague
ToS10-AT.svg S10 border with Austria near Dolní Dvořiště
Location
RegionsCentral Bohemian, South Bohemian
Major citiesTábor, České Budějovice
Highway system
  • Motorways
  • Expressways

The D3 motorway (Czech: Dálnice D3) is a highway in the Czech Republic. Currently only some segments of the route are in operation; when complete, it will run from Prague through Tábor and České Budějovice to the Czech-Austrian border at Dolní Dvořiště. It is part of the European route E55.

The D3 motorway in the South Bohemian Region towards the Austrian border should be completed by 2024.[1] Completion of D3 in the Central Bohemian Region is planned by 2028.

Course[]

Once completed, the 172-kilometre-long (107 mi) highway will connect the Czech capital Prague with the Austrian Mühlviertler Schnellstraße (S10) highway to Linz. As of December 2019 only 69.6 km (43.2 mi) of the highway are in operation, a section from Mezno to Úsilné, while a further 19.7 km (12.2 mi) from Úsilné to Dolní Třebonín are currently under construction. The most controversial and disputed section is the planned segment in the Central Bohemian Region.

A 24.0-kilometre-long (14.9 mi) section from Dolní Třebonín to the border with Austria on the other side of the future Mühlviertler Schnellstraße (S10) was initially planned to be built as an expressway (Czech: rychlostní silnice), however on 1 January 2016, the category of expressways was abolished, and it is counted as part of the D3 motorway.

Unfinished sections[]

Section Length Start of construction Completion
PrahaJílové u Prahy 9,51 km planned 2024[2] planned 2028[2]
Jílové u Prahy – Hostěradice 4,49 km
Hostěradice – Václavice 11,29 km
Václavice – Voračice 16,70 km
Voračice – Nová Hospoda 16,45 km
Úsilné – Hodějovice 7,2 km 04/2019[3] 2023[3]
Hodějovice – Dolní Třebonín 12,5 km 03/2019[4] 2023[4]
Dolní Třebonín – Kaplice-nádraží 8,5 km planned 2021[5] planned 2024[5]
Kaplice-nádraží – Nažidla 12,0 km planned 2022 planned 2025
Nažidla – border with Austria 3,5 km planned 2022 planned 2025

Images[]

References[]

  1. ^ "ŘSD může dostavět padesát metrů dálnice D3, vyvlastnění pozemku platí". iDNES.cz. 4 February 2019.
  2. ^ Jump up to: a b ŘSD: Ředitelství silnic a dálnic pokračuje s přípravou středočeské části dálnice D3
  3. ^ Jump up to: a b https://mapapp.rsd.cz/Upload/Stavby/39/infoletak_d3-usilne-hodejovice.pdf
  4. ^ Jump up to: a b "Directorate of roads and highways" (PDF).
  5. ^ Jump up to: a b https://mapapp.rsd.cz/Upload/Stavby/48/infoletak_d3-trebonin-kaplice.pdf

Coordinates: 49°22′47.29″N 14°43′27.32″E / 49.3798028°N 14.7242556°E / 49.3798028; 14.7242556

Retrieved from ""