Hillsdale station (Caltrain)

From Wikipedia, the free encyclopedia
Hillsdale
Southbound train leaving Hillsdale station, May 2021.jpg
A southbound train leaving Hillsdale station in May 2021
Location50 E 28th Ave San Mateo, California
Coordinates37°32′16″N 122°17′51″W / 37.53778°N 122.29750°W / 37.53778; -122.29750Coordinates: 37°32′16″N 122°17′51″W / 37.53778°N 122.29750°W / 37.53778; -122.29750
Owned byPeninsula Corridor Joint Powers Board
Platforms1 island platform
Tracks2
ConnectionsBus transport AC Transit: M
Bus transport Samtrans: ECR, 57, 250, 251, 256, 292, 294, 295, 397, 398
Bus transport Commute.org: Campus Drive, Lincoln Centre, Mariners' Island, Norfolk, Redwood City Bayshore Technology Park
Oracle Shuttle
Construction
ParkingAvailable
Bicycle facilitiesLockers available
Disabled accessYes
Other information
Fare zoneFare Zone 2
History
OpenedApril 26, 2021
Passengers
20183,229 per weekday[1]Increase 6.1%
Services
Preceding station Caltrain roundel.svg Caltrain Following station
Hayward Park Local (L1) Belmont
toward San Jose Diridon or Tamien
Weekend Local (L2)
Millbrae Limited (L3) Belmont
toward San Jose Diridon, Tamien or Gilroy
San Mateo Limited (L5) Redwood City
toward San Jose Diridon or Tamien
Millbrae Baby Bullet (B7) Redwood City
toward San Jose Diridon
     Limited (L4) does not stop here
Former services
Preceding station Southern Pacific Railroad Following station
Hayward Park Coast Line Belmont
toward Los Angeles
Terminus Peninsula Commute Belmont
toward San Jose
Location

Hillsdale station is one of three Caltrain stations in San Mateo, California. The station is next to the Bay Meadows neighborhood and close to the Hillsdale Shopping Center.

History[]

Bay Meadows station[]

Until it was closed on December 20, 2005, the Bay Meadows Racetrack was served by the now-removed Bay Meadows stop, less than a half-mile (800 m) north of Hillsdale. The Bay Meadows stop lacked a passenger shelter, and was just an opening in the chain link fencing where riders could access the grandstand parking lot. When Hillsdale was renovated, the platform was extended a few hundred feet to the north, eliminating the need for the separate station. Hillsdale is now the closest station to the former racetrack area.

Relocation[]

Hillsdale station in 2012

The City of San Mateo applied for Measure A funds to help fund a grade separation project in 2013; the majority of the $180 million project is funded from Measure A ($74 M) and Proposition 1A ($84 million, California High Speed Rail).[2] The 25th Avenue Grade Separation Project elevated tracks in southern San Mateo, eliminating the at-grade crossing at 25th Avenue and adding grade-separated crossings at 28th and 31st Avenues, which previously had been interrupted by Peninsula Corridor tracks.[3][4] Tracks will rise at the maximum allowable grade, starting from where they emerge south of the State Route 92 overcrossing, to minimize the depression of 25th Avenue to maintain vertical clearance for road vehicles under the new rail bridge.[3] The grade separation is also designed to accommodate a potential mid-line overtake required for Caltrain/HSR blended operations, which would expand the Peninsula Corridor right-of-way to up to four tracks.[3] PCJPB awarded an $82.9 million construction contract to the Shimmick/Disney Joint Venture in July 2017.[5]

As part of the grade separation project, Hillsdale station was relocated to the north. An initial design called for a station just north of 31st Avenue, with a transit center plaza and parking garage west of the tracks.[6] The final design has the station straddling 28th Avenue, closer to the transit-oriented development at Bay Meadows, approximately 2,000 ft (610 m) to the north. Preliminary renderings showed the new Hillsdale station with an island platform generally extending south from 28th, with parking provided east of the tracks.[2] A ceremonial groundbreaking for the grade separation project was held on September 26, 2017.[7][8] Construction of the grade separations began in fall 2017 and originally was scheduled to complete in spring 2021.[9] The grade separation included five new rail bridges: one at Beresford Creek (completed by late 2018);[10] three to separate road traffic, installed in 2019 over 25th (July), 28th (September), and 31st (October); and a pedestrian underpass between 28th and 31st. Rail traffic was redirected over the bridges starting on May 28, 2020.[11]

The existing parking lot at Hillsdale was closed in 2018, and a temporary lot, accessible from 28th, 31st, and Delaware, will serve Hillsdale. After construction of the new Hillsdale station is complete, the temporary lot will be upgraded and serve as the new permanent lot.[12] In its final configuration, there will be two lots east of the tracks; vehicle access to both the north lot (between 25th and 28th) and south lot (between 28th and 31st) is available from 28th, and there is an additional access point from 25th for the north lot.[13] Passengers can connect to SamTrans buses along El Camino Real. The station was temporarily closed on May 16, 2020 and initially was scheduled to reopen in fall 2020.[14] The project, initially estimated to cost $180 million, had a cost overrun of $25.9 million due to delays.[15] The 28th Avenue grade separation opened on March 1, 2021; with its opening, the at-grade crossing at 25th was closed.[16] The station ultimately reopened at its new location on April 26, 2021.[17] Later that year, 25th Avenue reopened on August 2,[18] and 31st opened on August 27.[19]

References[]

  1. ^ "2018 Annual Count Key Findings Report" (PDF). Caltrain. 2018.
  2. ^ a b "25th Avenue Grade Separation". Peninsula Corridor Joint Powers Board. 11 April 2017. Retrieved 10 May 2017.
  3. ^ a b c City of San Mateo (13 September 2013). "25th Avenue Grade Separation and Rail Realignment Project". City of San Mateo. Retrieved 18 October 2016.
  4. ^ "25th Avenue Grade Separation" (PDF). Caltrain Board of Directors. 7 July 2016. Retrieved 18 October 2016.
  5. ^ "Caltrain awards $82.9m contract for 25th Avenue grade separation project". Railway Technology. 10 July 2017. Retrieved 11 July 2017.
  6. ^ The Planning Center (September 2012). "Hillsdale Station Integration Plan". City of San Mateo. Retrieved 16 August 2021.
  7. ^ "Media Advisory: 25th Avenue Grade Separation Groundbreaking" (Press release). Peninsula Corridor Joint Powers Board. 21 September 2017. Retrieved 27 November 2017.
  8. ^ Weigel, Samantha (27 September 2017). "'This was a big idea'". San Mateo Daily Journal. Retrieved 27 November 2017.
  9. ^ Peninsula Corridor Joint Powers Board. "25th Avenue Grade Separation". Retrieved 4 July 2020.
  10. ^ "2th Avenue Grade Separation - Project Update" (PDF). City of San Mateo. November 5, 2018. Retrieved 16 August 2021.
  11. ^ "25th Avenue Grade Separation Project". City of San Mateo. Retrieved 16 August 2021.
  12. ^ Haigney, Sophie (28 December 2017). "Parking lot at Hillsdale Caltrain Station to close for construction". San Francisco Chronicle. Retrieved 29 December 2017.
  13. ^ "Hillsdale Station Opening". Peninsula Corridor Joint Powers Board.
  14. ^ "Hillsdale Station to Temporarily Close for Construction" (Press release). Peninsula Corridor Joint Powers Board. April 6, 2020.
  15. ^ Casimire, Astrid (January 20, 2021). "The city of San Mateo receives $23.8M grant to complete grade separation project". Bay City News Foundation. Retrieved 16 August 2021.
  16. ^ "28th Avenue to Open, 25th to Close as Part of 25th Avenue Grade Separation Project" (Press release). Peninsula Corridor Joint Powers Board. March 1, 2021.
  17. ^ "Hillsdale Station Opening" (Press release). Peninsula Corridor Joint Powers Board. April 2021.
  18. ^ "Grade-Separated East 25th Avenue Reopens" (Press release). Peninsula Corridor Joint Powers Board. August 2, 2021.
  19. ^ "Grade-Separated East 31st Avenue to Open" (Press release). Peninsula Corridor Joint Powers Board. August 24, 2021.

External links[]