Line 3 (Shijiazhuang Metro)

From Wikipedia, the free encyclopedia
Line 3
 3 
20201216 Train interior of SJZ Metro Line 3.jpg
Overview
StatusOperational
OwnerShijiazhuang
LocaleShijiazhuang, Hebei, China
Termini
Stations22
Service
TypeRapid transit
SystemShijiazhuang Metro
Services1
Operator(s)
History
Opened26 June 2017; 4 years ago (2017-06-26)
Technical
Line length26.7 km (16.6 mi)
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)

Line 3 of the Shijiazhuang Metro (Chinese: 石家庄地铁三号线; pinyin: Shíjiāzhuāng Dìtiě Sān Hào Xiàn) is a rapid transit line in Shijiazhuang. It was officially open on 26 June 2017. The line is currently 26.7 km long with 22 stations.

Opening timeline[]

Segment Commencement Length Station(s) Name
Shierzhong — Shijiazhuangzhan 26 June 2017 6.4 km (4.0 mi)[1] 6 Phase 1 (initial section)
Xisanzhuang — Shierzhong 20 January 2020[2] 5.4 km (3.4 mi)[2] 4 Phase 1 (Northern section)
Shijiazhuangzhan — Lexiang 6 April 2021[3] 14.9 km (9.3 mi)[3] 12 Phase 1 (Eastern section) & Phase 2

Stations[]

Station name Connections Distance
km
Location
English Chinese
西三庄 Xinhua
高柱
柏林庄
市庄
市二中
新百广场  1  Qiaoxi
东里
槐安桥
西三教
Shijiazhuangzhan 石家庄站 Shijiazhuang railway station SJP

 2 

Qiaoxi / Yuhua
汇通路
孙村
塔冢
东王
南王
位同
东二环南路
西仰陵
中仰陵
南豆
太行南大街
乐乡

References[]

  1. ^ 石家庄地铁开通 河北正式迈入“地铁时代”. CNR (in Chinese). 2017-06-27. Archived from the original on 2017-08-02. Retrieved 2019-05-27.
  2. ^ a b 石家庄地铁3号线一期工程北段将于1月20日开通运营. 河北新闻网 (in Chinese). 2020-01-16. Archived from the original on 2020-01-19. Retrieved 2021-11-28.
  3. ^ a b 准备就绪!石家庄地铁3号线明日开通新线14.9公里. 长城网 (in Chinese). 2021-04-05. Archived from the original on 2021-04-05. Retrieved 2021-11-28.
Retrieved from ""