Princes Motorway

From Wikipedia, the free encyclopedia

Princes Motorway

F6 Freeway / Southern Freeway

New South Wales
Southern Freeway, near Helensburgh NSW.jpg
Princes Motorway near Helensburgh
Princes Motorway is located in New South Wales
Princes Motorway
Princes Motorway
Coordinates
General information
TypeMotorway
Length55.4 km (34 mi)[1]
Opened1963 (initial at-grade section)
1964 (as F6)
Route number(s)
  • M1
  • Entire route
Former
route number
  • National Route 1
  • (Mount Ousley Road section, 1975-mid 1980s; entire route mid 1980s-2013)
  • F6
  • (Waterfall-Bulli Tops and Gwynneville-Yallah sections, 1975-mid 1980s)
Major junctions
North end
  • Princes Highway (A1)
  • Waterfall, New South Wales
 
South end
  • Princes Highway (A1)
  • Oak Flats, New South Wales
Location(s)
Major suburbs / townsHelensburgh, Wollongong, Figtree, Dapto
Highway system

The Princes Motorway is a 55-kilometre (34 mi)[1] predominately dual carriage untolled motorway that links Sydney to Wollongong and further south through the Illawarra region to Albion Park Rail. Part of the Australian Highway 1 network, the motorway is designated with the route number M1.

The motorway is sometimes known by its previous signposting F6 (Freeway Route 6) and its previous name, the Southern Freeway, which applied to the sections between Waterfall and Bulli Tops as well as Gwynneville and Yallah.[2] The section between Bulli Tops and Gwynneville was known as Mount Ousley Road, and was first built as a defence route and later upgraded to dual carriageway standards. In early 2013, as part of the New South Wales alphanumeric route conversion process, the entire motorway was renamed to its current name and signposted M1.[3]

It is the backbone of road traffic in the Illawarra.[4] As Wollongong and Port Kembla are important industrial centres, freight traffic is heavy. Despite the current decline of the local steel industry, emergence of Wollongong as a commuter city of Sydney has kept the motorway busy.

Sections[]

The northern terminus of the Princes Motorway looking south from Waterfall, pictured in 2007.

In the north, the Princes Motorway route starts at Waterfall, taking more or less a parallel route with Princes Highway until the sprawling Bulli Tops interchange (with Appin Road (B69) and Princes Highway). There it continues downhill, avoiding the steep Bulli Pass, and bypasses Wollongong CBD, through Gwynneville and continues for 20 kilometres (12 mi), bypassing the suburb of Yallah, and rejoining the Princes Highway north of Albion Park Rail near the Princes Highway junction with the Illawarra Highway. The motorway is being extended southwards via the Albion Park Rail Bypass.[4]

The motorway can be divided into four sections:

  • between Waterfall and Bulli Tops (formerly Southern Freeway)
  • between Bulli Tops and Gwynneville (also known as Mount Ousley Road)
  • between Gwynneville to Yallah (formerly Southern Freeway)
  • Albion Park Rail Bypass

Waterfall to Bulli Tops section[]

Construction of the section between Waterfall and Bulli Tops commenced in July 1970.[4][5] At 22.9km, it was then the longest section of freeway to completed at one time, at a cost of $30.5 million.[4] Financed by State Government bonds, from its opening on 24 July 1975, this section of freeway initially incurred a toll.[5][6] This part of the freeway did not feature the Helensburgh Interchange (which subsequently opened in February 2000). The toll operated for 20 years, which was 10 years short of its intended operating length. The main reason for this was local residents complaining that the F3 Freeway had its toll dropped in 1988, which was at the time intended to be dropped as its loans had been fully paid off unlike those of the F6.

After much pressure the toll for the F6 freeway was removed on 30 July 1995 as the loans had been repaid.[7] Remnants of the tollbooths could initially be seen at the old toll plaza at Waterfall, such as faint markings and a set of warning lights in the southbound direction for the toll plaza. These remnants have since been removed. However, as of 2021, the widened carriageways for the toll booths can still be seen at

 WikiMiniAtlas
34°09′02″S 150°59′25″E / 34.150476°S 150.990208°E / -34.150476; 150.990208.

To complement the tollway, the dual carriageways of the Princes Highway from Waterfall north to Loftus and the Sutherland bypass were constructed and opened to traffic on 16 September 1975.[4]

Mount Ousley Road section[]

The section between Bulli Tops and Gwynneville was previously known as Mount Ousley Road,[8] and is still often referred to as such.[9] It was built in 1942 as a defence route and was later upgraded to dual carriageway to help facilitate traffic as it now connects the two sections of the F6.[8] It is sometimes not considered part of the freeway proper,[4] as it is not fully built to freeway standards, containing left-in/left-out intersections and an at-grade intersection, though most major intersections are fully controlled access.[8] This at-grade intersection, located at the base of Mount Ousley, is proposed to be upgraded to a full controlled-access intersection.[10] The federal government announced funding for the intersection in May 2021.

In November 2015, it was announced that the section between Bulli Tops and Picton Road would have a third lane added in each direction.[11] As of 2019, detailed design works have been completed.[12]

Gwynneville to Yallah section[]

The construction of the section between Gwynneville and Yallah of motorway commenced in May 1959, initially as a bypass of the Wollongong City Centre.[4] A small section of this route, between Princes Highway and Foley Street, opened in December that year [4] The full first section opened to traffic in July 1963, though as a two-lane road with at-grade intersections.[4] The connection to Mount Ousley Road was made in March 1964, signalling the beginnings of the F6.[4] Duplication of the route to West Wollongong was completed in 1965.[4] The freeway continued making its way southward, with extensions to Masters Road opening in 1967, to Northcliffe Drive in 1973 (albeit as a single carriageway, with duplication finished in 1975), to Kanahooka Road in 1978 (with duplication concluding in 1979), Fowlers Road in 1981 (with duplication concluding in 1983), and to its current terminus at Yallah in 1986 (with duplication concluding in 1987).[4] The intersection with the Northern Distributor at Gwynneville remained an at-grade intersection before a new intersection was built and entered service in December 1998.[4]

Albion Park Rail Bypass[]

At the southern end, the Princes Motorway is being extended to Oak Flats along the 9.8 km Albion Park Rail Bypass, which is undergoing construction.[13] The bypass will complete the 'missing link' for a high standard road between Sydney and Bomaderry.[13] The bypass is being built on a reserved corridor which was identified by Roads and Traffic Authority in a study in the mid 1990s. In 2013, the Roads and Maritime Services confirmed the reserved corridor to be suitable for the bypass.[13]

The bypass is expected to be completed in mid-2021, one year ahead of schedule.[14][15] The section of the bypass between Yallah and Terry Street (Illawarra Highway) at Albion Park was temporarily open to traffic in May 2021.[16][17][18] The northbound lanes of the bypass opened to traffic on 7 August 2021.[19][20][21]

Exits and interchanges[]

LGALocationkm[22]miDestinationsNotes
SutherlandWaterfall00.0 Princes Highway (A1) – Sutherland, Heathcote, Sydney CBD, Sydney AirportNorthern terminus; continues north as Princes Highway (A1)
00.0Princes Highway  – Woronora Dam, HelensburghNorthbound entrance and southbound exit only
WollongongHelensburgh6.494.03Exit to Lawrence Hargrave Drive – Helensburgh, Stanwell Tops, Stanwell Park, OtfordSouthbound exit only
7.14.4Entrance via Lawrence Hargrave Drive – Helensburgh, Stanwell Tops, Stanwell Park, OtfordSouthbound entrance only
7.44.6Princes Highway – Helensburgh, Stanwell Tops, Stanwell Park, OtfordNorthbound entrance only
7.84.8Princes Highway – Helensburgh, Stanwell Tops, Stanwell Park, OtfordNorthbound exit only
Thirroul18.511.5Princes Highway – Sublime Point Lookout and Maddens Plains, Bulli, CorrimalSouthbound exit only
19.312.0Princes Highway – Sublime Point Lookout, Maddens Plains, Bulli and CorrimalSouthbound entrance only
2113 Appin Road (B69) – Appin, CampbelltownSouthbound exit and northbound entrance only
Balgownie30.118.7 Picton Road (B88) - PictonNorthbound entrance only
30.418.9 Picton Road (B88) - PictonSouthbound and northbound exits only
30.919.2 Picton Road (B88) - PictonSouthbound entrance only
31.319.4Clive Bissell Drive - Mount KeiraNorthbound exit and entrance only
34.221.3New Mount Pleasant Road - Balgownie, Fairy MeadowSouthbound exit and entrance only
Mount Ousley35.722.2Mount Ousley Road - Mount Ousley to Princes Highway and Memorial Drive (B65)Southbound exit only
35.822.2Mount Ousley Road - Mount Ousley from Princes Highway and Memorial Drive (B65)Northbound and southbound entrances only
Keiraville36.022.4Irvine St / Northfields Avenue - University of Wollongong, Keiraville, GwynnevilleNorthbound exit and entrance only
36.222.5University Avenue - University of Wollongong, Keiraville, GwynnevilleSouthbound exit and entrance only
Gwynneville36.522.7To Memorial Drive (B65) - North Wollongong, GwynnevilleNorthbound exit only
36.822.9To Memorial Drive (B65) - North Wollongong, GwynnevilleNorthbound and southbound entrances only
West Wollongong38.123.7Robsons Road - West WollongongNorthbound entrance only
Mangerton38.724.0Princes Highway - Wollongong, FigtreeSouthbound entrance from Princes Highway southbound only
Figtree39.924.8Masters Road - Spring Hill, Port Kembla, WollongongNorthbound entrance and southbound exit only
40.625.2Masters Road - Spring Hill, Port Kembla, WollongongSouthbound entrance only
Unanderra42.026.1Five Islands Road - Unanderra, Port Kembla
Berkeley45.128.0Northcliffe Drive - Kembla Grange, Warrawong, Port Kembla
Kanahooka47.829.7Kanahooka Road - Dapto, Kanahooka, KoonawarraNorthbound entrance and southbound exit only
Dapto49.530.8Fowlers Road - Dapto, KoonawarraNorthbound entrance and southbound exit only
ShellharbourYallah53.032.9 Princes Highway – Yallah, Haywards Bay, Albion Park Rail, Illawarra Regional Airport, Kiama, Nowra and Melbourne, VictoriaNorthbound entrance and southbound exit only
53.833.4Princes Highway – Yallah, DaptoNorthbound exit only
Albion Park Rail56.635.2 Terry Street (Illawarra Highway) (A48) – Albion Park, Robertson, Sutton ForestNorthbound entrance and southbound exit only
Temporary southern terminus for southbound direction; continues as Terry Street (Illawarra Highway) (A48) in the southbound direction only on a temporary basis
58.236.2Tongarra Road – Albion Park, Robertson, Sutton ForestNorthbound exit only; southbound entrance not open to traffic
Westbound left turn towards Tongarra Road (Illawarra Highway) (A48) open on a temporary basis
Oak Flats61.438.2East West Link / Oak Flats Interchange – Oak Flats, ShellharbourNorthbound entrance only; southbound exit not open to traffic
62.138.6 Princes Highway (A1) – Kiama, Nowra and Melbourne, VictoriaSouthern terminus; continues as Princes Highway (A1)
Southbound direction not open to traffic
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
  •       Incomplete access

Proposed extensions[]

Northern extension[]

Captain Cook Bridge
Taren Point Road
The six-lane Captain Cook Bridge (connecting Sans Souci to Taren Point) and a short joining section of Taren Point Road to the south are the only parts of the extension to be built

The County of Cumberland planning scheme of 1948 outlined an F6 extension from the current-day end-point at Waterfall.[23] As such, an F6 corridor was set aside that passes through the Royal National Park from Waterfall to Campbell Road in St Peters. The land reservation tract currently passes through the suburbs of Loftus, Kirrawee, Gymea, Miranda, Taren Point, Sandringham, Sans Souci, Ramsgate, Monterey, Kogarah, Brighton-Le-Sands, Rockdale, Banksia, Arncliffe, Kyeemagh and Tempe.[24]

Of the proposed extension, only the six-lane Captain Cook Bridge and a short connecting section of Taren Point Road to the south have been built. Establishment of the bridge section of the F6 extension began in 1962, expedited to replace the ferry service that had operated from Taren Point to Sans Souci since 1916. Captain Cook Bridge was opened in May 1965.[25]

In the original plan, the F6 would connect to the Western Distributor.[26] Then, in August 1977, premier Neville Wran cancelled the inner section of the F6 link, which at the time had an estimated construction cost of $96 million.[25] At the same time, Wran announced that the inner section reservation would be sold off and the proposed extension would instead terminate at St Peters, a medium density industrial suburb.[25][27][28]

Prior to the 2007 federal election, the Liberal-Nationals (Coalition) government promised to allocate $20 million towards planning for the F6 extension.[29] Although the Coalition lost the 2007 election,[30] the funding was once again promised at the subsequent 2010 federal election. This funding would ensure the project is "shovel ready" when funding becomes available.[31]

In the mid 2010s, the F6 extension project was revived under the Liberal-National coalition state government. This project has since been renamed M6 Motorway.

See also[]

  • Freeways in New South Wales

References[]

  1. ^ Jump up to: a b "Princes Highway & A1 & M1 & Princes Motorway, New South Wales to 3-5 Princes Highway, Albion Park Rail NSW 2527". Google Maps. Google. 2016. Retrieved 11 October 2016.
  2. ^ F6 Southern Freeway, Ozroads: the Australian Roads Website. Retrieved 24 August 2008.[self-published source]
  3. ^ "Information for Southern NSW & ACT". Alpha-numeric route numbers. Roads and Maritime Services. 20 May 2013. Archived from the original on 15 June 2013. Retrieved 13 June 2013.
  4. ^ Jump up to: a b c d e f g h i j k l m "F6 Southern Freeway : History and Development". OZRoads: The Australian Roads Website. Retrieved 28 November 2018.
  5. ^ Jump up to: a b Tollwork to link centres Truck & Bus Transportation July 1970 page 181
  6. ^ Lewis Opens Super Road Illawarra Mercury 25 July 1975
  7. ^ State Government abolishes F6 charge Daily Telegraph Mirror 17 May 1995 page 5
  8. ^ Jump up to: a b c "NATIONAL ROUTE 1 - Mount Ousley Road section". OZRoads - The Australian Roads Website. Retrieved 28 November 2018.
  9. ^ Thompson, Angela. "Woman hurt after car wedged under truck and dragged down Mount Ousley". Illawarra Mercury. Retrieved 28 November 2018.
  10. ^ "Mount Ousley interchange". Transport for NSW - Roads and Mairimte. Retrieved 18 June 2021.
  11. ^ Humphries, Glen (2 November 2015). "Extra lanes for motorway between Picton Road and Bulli Tops". Illawarra Mercury. Archived from the original on 3 November 2015.
  12. ^ "Improvements between Picton Road & Bulli Tops". Transport for NSW - Roads and Maritime. Retrieved 18 June 2021.
  13. ^ Jump up to: a b c "Albion Park Rail bypass - Princes Highway upgrade". Roads and Maritime Services. Retrieved 30 October 2019.
  14. ^ "Early opening for Albion Park Rail Bypass". Transport for NSW - Roads and Maritime. 16 November 2020. Retrieved 19 November 2020.
  15. ^ "Albion Park Rail bypass - Project Update June 2019" (PDF). Roads and Maritime Services. June 2019. Archived from the original (PDF) on 23 June 2019. Retrieved 23 June 2019.
  16. ^ "Take a ride along latest section of the Albion Park Rail bypass". Illawarra Mercury. 25 May 2021. Retrieved 21 June 2021.
  17. ^ "Key section of Albion Park Rail bypass opens to traffic". Wave FM 96.5. 26 May 2021. Retrieved 21 June 2021.
  18. ^ "Albion Park Rail bypass opening a few steps away". Transport for NSW - Roads and Maritime. 19 June 2021. Retrieved 21 June 2021.
  19. ^ "True north for Albion Park Rail bypass as lanes open". Transport for NSW - Roads and Waterways. 7 August 2021. Retrieved 9 August 2021.
  20. ^ "Northbound lanes of Albion Park Rail bypass now open to traffic". Illawarra Mercury. 7 August 2021. Retrieved 9 August 2021.
  21. ^ "Albion Park Rail bypass open Northbound". Wave FM 96.5. 7 August 2021. Retrieved 9 August 2021.
  22. ^ "M1, Helensburgh NSW 2508 to Albion Park Rail, New South Wales 2527". Google Maps. 2021. Retrieved 21 June 2021.
  23. ^ "10 reasons for not building an F6 Motorway" (PDF). Sutherland Shire Environment Centre. 2005. Retrieved 30 August 2010.
  24. ^ "F6 Corridor Public Transport Use Assessment" (PDF). Roads and Traffic Authority. September 2004. Archived from the original (PDF) on 4 April 2012. Retrieved 30 August 2010.
  25. ^ Jump up to: a b c "F6 Southern Freeway : History and Development". Ozroads. Retrieved 30 August 2010.[self-published source]
  26. ^ "Western Distributor - Construction Information". Retrieved 11 May 2011.[self-published source]
  27. ^ Baker, Jordan (27 February 2007). "Shire will become car park unless F6 is built: NRMA". The Sydney Morning Herald. Retrieved 30 August 2010.
  28. ^ Baker, Jordan (12 February 2007). "F6 extension – the great dividing road". The Sydney Morning Herald. Retrieved 30 August 2010.
  29. ^ "$20 million worth of progress on F6". NRMA. 5 November 2007. Archived from the original on 28 November 2010. Retrieved 30 August 2010.
  30. ^ "Kevin Rudd claims victory in federal election". The Sydney Morning Herald. 24 November 2007. Retrieved 30 August 2010.
  31. ^ Kelly, Craig; Morrison, Scott (2 August 2010). "Morrison/Kelly Announce $20 Million to Get F6 Extension Tunnel Shovel Ready". Liberal Party of Australia. Archived from the original on 26 August 2010. Retrieved 30 August 2010.
Retrieved from ""