Ranjiaba station
Ranjiaba 冉家坝 | |||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Location | Chongqing China | ||||||||||||||||||||
Operated by | Chongqing Rail Transit Corp., Ltd | ||||||||||||||||||||
Line(s) | Loop 5 6 | ||||||||||||||||||||
Platforms | 6 (2 island platforms and 2 side platforms) | ||||||||||||||||||||
Connections | |||||||||||||||||||||
Construction | |||||||||||||||||||||
Structure type | Below ground | ||||||||||||||||||||
Disabled access | Yes | ||||||||||||||||||||
Other information | |||||||||||||||||||||
Station code | 0/11、5/08、6/15 | ||||||||||||||||||||
History | |||||||||||||||||||||
Opened |
| ||||||||||||||||||||
Services | |||||||||||||||||||||
|
Ranjiaba is a station on Line 5, Line 6, and the Loop Line of Chongqing Rail Transit in Chongqing Municipality, China.[1][2] It is located in Yubei District and serves its surrounding area, including nearby office towers, residential blocks and a mall.
It opened on January 20th, 2013 with Line 6.
Line 5 services were later added on December 28th, 2017. The station expanded exactly 1 year later with the opening of the Loop Line section of the station on 28th of December 2018.
Station Structure[]
Loop Line Platforms[]
- Platform Layout
There are 2 side platforms for Loop Line trains.
Side Platform Doors open on the right | ||||
To Loop Chongqing Library | ← | 0/11 | ← | Anti-Clockwise loop |
---|---|---|---|---|
Clockwise loop | → |
0/11 |
→ | To Loop |
Side Platform Doors open on the right |
Line 5 & Line 6 Platforms[]
- Platform Layout
A total of 2 island platforms are used for Line 5 and Line 6 trains travelling in both directions.
These 2 platforms were designed with cross-platform interchange in mind and were built during the construction of Line 6. Spaces on the opposite end of the platforms were reserved for Line 5 at the time and came into use when the metro line became operational in 2017.
Island Platform on B2
To 6 | ← |
6/15 |
← | ||
---|---|---|---|---|---|
Doors open on the left
Doors open on the right |
|||||
To 5 | ← | 5/08 | ← |
Island Platform on B3
→ |
6/15 |
→ | To 6 | ||
---|---|---|---|---|---|
Doors open on the right
Doors open on the left |
|||||
→ | 5/08 | → | To 5 |
References[]
- Railway stations in Chongqing
- Railway stations in China opened in 2013
- Chongqing Rail Transit stations
- Chongqing railway station stubs