Shalimar–Udaipur City Weekly Express

From Wikipedia, the free encyclopedia

Shalimar–Udaipur City Weekly Express
Overview
Service typeExpress
First service19 February 2012; 9 years ago (2012-02-19)
Current operator(s)North Western Railway
Route
StartShalimar (SHM)
Stops22
EndUdaipur City (UDZ)
Distance travelled1,881 km (1,169 mi)
Average journey time36h 33m
Service frequencyWeekly [a]
Train number(s)19659/19660
On-board services
Class(es)AC 2 tier, AC 3 tier, Sleeper class, General Unreserved
Seating arrangementsNo
Sleeping arrangementsYes
Catering facilitiesOn-board catering
E-catering
Observation facilitiesLHB coaches
Entertainment facilitiesNo
Baggage facilitiesNo
Technical
Rolling stock2
Track gauge1,676 mm (5 ft 6 in)
Operating speed51 km/h (32 mph), including halts

The Shalimar–Udaipur City Weekly Express is an Superfast Express train belonging to North Western Railway zone that runs between Shalimar and Udaipur City in India. It is currently being operated with 19659/19660 train numbers on a weekly basis.[1][2][3]

Service[]

The 19659/Shalimar–Udaipur City Weekly Express has an average speed of 51 km/hr and covers 1881 km in 36h 33m. The 19660/Udaipur City–Shalimar Weekly Express has an average speed of 50 km/hr and covers 1881 km in 37h 55m.

Route and halts[]

The important halts of the train are :

Coach composition[]

The train has standard LHB rakes with max speed of 110 kmph. The train consists of 18 coaches:

  • 1 AC II Tier
  • 2 AC III Tier
  • 7 Sleeper coaches
  • 6 General Unreserved
  • 2 Seating cum Luggage Rake

Traction[]

Both trains are hauled by a Santragachi Loco Shed-based WAP-4 or Tatanagar Loco Shed-based WAM-4 electric locomotive from Howrah to Kota. From Kota train is hauled by a Ratlam Loco Shed-based or Abu Road Loco Shed-based WDM-3A diesel locomotive up till Udaipur, and vice versa.

Direction reversal[]

The train reverses its direction 1 times:

See also[]

References[]

  1. ^ Due to Public Agitation in Ahmedabad Division, some Western Rly trains are cancelled, partially cancelled & diverted
  2. ^ Due to Public Agitation in Ahmedabad Division, some Western Rly trains are cancelled, partially cancelled & diverted
  3. ^ "Completion of girder launching work of ROB at Bagnan much ahead of Schedule". South Eastern Railway. 22 December 2013. Retrieved 27 September 2018.

Notes[]

  1. ^ Runs one day in a week for every direction.

External links[]


Retrieved from ""