Tuckahoe station

From Wikipedia, the free encyclopedia

Tuckahoe
Tuckahoe NY Metro-North railroad station 2015.jpg
Looking southwest at Tuckahoe station from the northwest corner of Main Street and Oak Avenue
Location1 Depot Square, Tuckahoe, New York
Coordinates40°57′02″N 73°49′42″W / 40.9505°N 73.8284°W / 40.9505; -73.8284Coordinates: 40°57′02″N 73°49′42″W / 40.9505°N 73.8284°W / 40.9505; -73.8284
Line(s)Harlem Line
Platforms2 side platforms
Tracks3
ConnectionsBee-Line Bus System: 8
Construction
Parking314 spaces
Other information
Fare zone3
History
OpenedJuly 2, 1844[1]
Rebuilt1901, c. 1912, 1989
Electrified700V (DC) third rail
Passengers
2006408,876 Steady 0%
Services
Preceding station MTA NYC logo.svg Metro-North Following station
Bronxville Harlem Line Crestwood
Former services
Preceding station New York Central Railroad Following station
Bronxville
toward New York
Harlem Division Crestwood
toward Chatham

Tuckahoe station is a commuter rail stop on the Metro-North Railroad's Harlem Line, located in the village of Tuckahoe, New York. It is 16 miles (25.7 km) from Grand Central Terminal and travel time there is approximately 39 minutes. As of August 2006, daily commuter ridership was 1,378 and there are 314 parking spots.[2] The station is located in the Zone 3 Metro-North fare zone.

History[]

The New York and Harlem Railroad laid tracks through Tuckahoe during the mid-1840s, and evidence of a station in Tuckahoe can be found at least as far back as the 1850s.[3][4] The current Tuckahoe station building was originally built in 1901, by the New York Central Railroad, and was given an additional baggage elevator approximately in 1912.[5] The station continued to serve commuters without much change until the New York Central merged with rival Pennsylvania Railroad to form Penn Central in 1968. As Penn Central was facing bankruptcy, the Metropolitan Transportation Authority began subsidizing service in 1970, and high-level platforms were constructed to accommodate the new M1A electric MU cars being delivered at the time. Operation of the railroad continued and was passed on to Conrail in 1976. Metro-North took over direct operation in 1983.

In the Spring of 1989, the platforms were reconstructed, along with those of Fleetwood, Bronxville, and Crestwood stations.[6] The baggage and freight elevators were also converted into passenger elevators. Along with Hartsdale and Scarsdale, it is one of three stations on the Harlem Line that features a Starbucks coffee shop inside its station building, a location which opened in June 2006.

Station layout[]

The station has two high-level side platforms, each 12 cars long.[7]: 10 

References[]

  1. ^ "Extension of the Harlem Railroad". The Evening Post. New York, New York. July 2, 1844. p. 2. Retrieved May 26, 2020 – via Newspapers.com. open access
  2. ^ New York Times 2006 Metro-North commuuter rail info
  3. ^ Tuckahoe History Committee (Village of Tuckahoe: Official Website) Archived July 3, 2014, at the Wayback Machine
  4. ^ 1858 New York and Harlem Railroad Map (I Ride the Harlem Line)
  5. ^ Tuckahoe Station (Library of Congress: American Memory) Archived August 12, 2014, at the Wayback Machine
  6. ^ Harlem Line Schedule History (iRide the Harlem Line)
  7. ^ "Metro-North Railroad Track & Structures Department Track Charts Maintenance Program Interlocking Diagrams & Yard Diagrams 2015" (PDF). Metro-North Railroad. 2015. Retrieved January 28, 2019.

External links[]

Retrieved from ""