Behala Chowrasta metro station
Behala Chowrasta বেহালা চৌরাস্তা | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Kolkata Metro | |||||||||||
Location | Diamond Harbour Rd, Behala Chowrasta, Kolkata, West Bengal 700008 India | ||||||||||
Coordinates | 22°29′15″N 88°18′48″E / 22.487529°N 88.313426°E | ||||||||||
Owned by | Metro Railway, Kolkata | ||||||||||
Operated by | Metro Railway, Kolkata | ||||||||||
Platforms | Side Platform | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Elevated | ||||||||||
Platform levels | 2 | ||||||||||
Parking | No | ||||||||||
Disabled access | Yes | ||||||||||
Other information | |||||||||||
Status | Under construction | ||||||||||
History | |||||||||||
Opening | 2022 | ||||||||||
Electrified | 750V DC | ||||||||||
Services | |||||||||||
| |||||||||||
Location | |||||||||||
Behala Chowrasta Location within Kolkata |
Behala Chowrasta is a planned metro station of Kolkata Metro Line 3, which is under construction.[1] It is an elevated station, and will have side platforms. It is due to open in the first phase of this line. This is expected to be opened in 2022.
History[]
The work has been sanctioned in 2010-11 for new Metro line from Joka to BBD Bagh for a length of 16.72 km at an anticipated cost of Rs. 2619.02 Crores. The station will be launched in 2021.[2]
The station[]
Structure[]
Behala Chowrasta elevated metro station situated on the Line 3 of Kolkata Metro. It is located exactly above the Behala Chowrasta intersection on Diamond Harbour Road / NH-12.
Layout[]
G | Street Level | Exit/Entrance |
L1 | Mezzanine | Fare control, Station agents, Metro Card vending machines, crossover |
L2 | Side platform doors will open on the left | |
Northbound | Towards →Esplanade/Taratala→ → | |
Southbound | →Towards ←Joka/Diamond Park← ← | |
Side platform doors will open on the left | ||
L2 |
Electricity and signal systems[]
Like the other stations and lines of the Kolkata Metro, this station will use 750 volts DC power supply by the third railway to operate the trains.
Train movement will be conducted at this station and on the railway by communication-based train control signal system. This signal system can operate a 5 second interval train.
References[]
- ^ "Metro Railway Kolkata / Indian Railways Portal". mtp.indianrailways.gov.in. Retrieved 2019-08-25.
- ^ Bandyopadhyay, Krishnendu (March 1, 2019). "Work begins at Joka Metro depot, wall built". The Times of India. Retrieved 2019-06-28.
External links[]
- Kolkata Metro stations