Metrovalencia

From Wikipedia, the free encyclopedia

Metrovalencia
Isologo de Metrovalència.svg
Overview
OwnerFGV
LocaleValencia, Spain
Transit typeCommuter rail
Rapid transit
Light metro
Tram
Number of lines9[1]
  • 6 rail lines (L1, L2, L3, L5, L7, L9)
  • 3 tram lines (L4, L6, L8)
Number of stations138
  • 35 underground stations
  • 103 surface stations
Daily ridership190,253 (avg. weekday, 2019)
Annual ridership69,442,539[2] (2019)
Chief executiveMario Flores Lanuza
Operation
Began operation8 October 1988 (as FGV)
5 May 1995 (as MetroValencia)
Number of vehicles108[1]
Technical
System length156.4 km (97.2 mi)[1]
  • 27.3 km (17.0 mi) underground
  • 129.1 km (80.2 mi) surface
Track gauge1,000 mm (3 ft 3+38 in) metre gauge
Electrification750 V DC
1500 V DC, overhead wire
Map of Metrovalencia

Mapa metrovalencia.svg

Metrovalencia[a] is an urban rail system serving a large part of the metropolitan area of Valencia. The network is a modern amalgamation of former FEVE narrow gauge electric operated suburban railways. It is a large suburban network that crosses the city of Valencia, with all trains continuing out to the suburbs. It also has destinations on lines that make it more closely resemble commuter trains. The unique system combines light railway, metro and several tram operations north of the Túria riverbed park with line 4. Trains of lines 1, 3, 5 and 9 have automatic train operation (ATO) in 25.3 kilometers of underground system.[3] Tram lines 4, 6 and 8 are operated by modern trams.[4]

This network consists of more than 156.4 kilometres (97.2 mi) of route, of which 27.3 kilometres (17.0 mi) is underground.[1]

The system authority Ferrocarrils de la Generalitat Valenciana (FGV) uses bilingual signage in Valencian and Spanish.

Operations[]

Lines[]

Line Terminals Year opened[5] Service type Length[1] Stations[1] Passengers in 2018[2]
Línia 1 de Metrovalència.svg Bétera – Villanueva de Castellón 1988 Underground + Regional train 72.145 km
(44.829 mi)
40 9,808,295
Línia 2 de Metrovalència.svg Llíria – Torrent Avinguda 1988 Underground + Regional train 39.445 km
(24.510 mi)
33 9,124,791
Línia 3 de Metrovalència.svg Rafelbunyol – Aeroport 1995 Underground + Regional train 24.691 km
(15.342 mi)
27 14,147,324
Línia 4 de Metrovalència.svg Mas del Rosari/Ll. Llarga/Fira – Dr. Lluch 1994 Tramway 16.999 km
(10.563 mi)
33 6,644,251
Línia 5 de Metrovalència.svg Marítim-Serreria – Aeroport 2003 Underground 13.293 km
(8.260 mi)
18 10,774,501
Línia 6 de Metrovalència.svg Tossal del Rei – Marítim Serrería 2007 Tramway 3.571 km
(2.219 mi)
21 2,112,300
Línia 7 de Metrovalència.svg Marítim Serrería – Torrent Avinguda 2015 Underground 15.497 km
(9.629 mi)
16 7,702,423
Línia 8 de Metrovalència.svg Marina Real Juan Carlos I – Marítim Serrería 2015 Tramway 1.230 km
(0.764 mi)
4 433,213
Línia 9 de Metrovalència.svg Alboraya-Peris Aragó – Riba-roja de Túria 2015 Underground + Regional train 24.859 km
(15.447 mi)
23 8,695,441

Notes: In 1998, Line 2 was combined with Line 1; it became a separate branch again in 2015. Lines 7 to 9 were created in 2015 by splitting existing branch lines, with the only new stations for these lines consisting of the extension from Manises to Riba-roja de Túria.

The network includes five unmanned stations: Rocafort, Fuente del Jarro, Massarojos, Benaguasil 1 and Font de l´Almaguer.[6]

Technical data[]

  • Gauge width: 1,000 mm (3 ft 3+38 in) metre gauge (narrow gauge)
  • Current system: 750 V DC / 1500 V DC, overhead wire

Passenger numbers[]

In 2012, an estimated 63,103,814 passengers used the service, a decline of 2.8% from the 65,074,726 who had used it in 2011. The 2011 figures had shown a 5% decline compared to 2010. On average 172,887 passengers a day used the service in 2012 with the busiest day being 18 March, the final day of the Fallas festival, when 482,960 passengers used the service. The three most used stations on the network were all in the centre of Valencia: Xàtiva, beside Valencia's main train station, with 4,769,628 passengers in 2012, Colón, in one of Valencia's main shopping streets, with 4,189,736 passengers and Àngel Guimerà, an interchange station for lines 1,4 and 5 situated beside Valencia old town, with 2,461,012 users. The fourth and fifth busiest stations were Túria, next to Valencia's main bus station, with 2,035,521 and Facultats, serving the University of Valencia, with 1,951,080 users. The remaining stations in the top eight were Plaça de Espanya (1,807,538 passengers), Amistat (1,552,281) and Mislata (1,505,106). The first two of these were located in areas near Valencia centre, while Mislata was the main station for the satellite town of the same name.[7]

In 2014, the system carried 60,111,000 passengers.[8]

In 2015, 60,686,589 passengers used the network, reversing a decline which had occurred in previous years. Seventeen stations reported more than 1 million users in that year.[9]

In 2019, patronage reached an all-time high of over 69 million. The ten busiest stations were Xàtiva with 5,459,784 passengers, Colón (4,520,931); Àngel Guimerà (3,067,957); Túria (2,044,393); Plaça d'Espanya (2,035,060); Facultats (1,951,546); Benimaclet (1,837,812); Amistat-Casa de Salud (1,817,120); Mislata (1,708,658); Avinguda del Cid (1,598,112).

History[]

The Metrovalencia network traces its origins to the (ca; es) system of narrow-gauge interurban railways, of which its first section, built by the Valencian Tramway Society (es:Sociedad Valenciana de Tranvías) was opened in 1888 between Valencia (near the Pont de Fusta, or Fusta Bridge) and Llíria. Several further extensions of the Trenet were later built between 1891 and 1912. In 1917, both the Valencian Tramway Corporation and the (es) were merged into a single company called the Valencia Tram and Rail Company (es:Compañía de Tranvías y Ferrocarriles de Valencia), which operated until 1964 where after years of losses, the rail operations of CTFV was acquired by FEVE.

First four lines[]

Lines 1 and 5 at Torrent Avinguda Station. Differences between the old line (1) and the new line (5) can be seen in this picture

On 8 October 1988 the tunnel through which line 1 crosses Valencia was opened between and Ademuz (now ), which connected the line with southbound trains from València-Jesús to Castelló de la Ribera (now Villanueva de Castellón) at Sant Isidre. Line 2 went from València-Sud to Llíria, with some trains terminating in Paterna.

In May 1994 the tranvia line 4 opened. Valencia was the first city in Spain to use this mode of transport in the modern era. Originally, line 4 was 9.7 kilometres (6.0 mi) long and had 21 stations. The line connected the suburban lines with high demand zones such as the Polytechnic University, the new university campus and the , which the former line Empalme - Pont de Fusta - El Grau had connected before. One year later, in May 1995, line 3 was extended from El Palmaret in Alboraria to Alameda. The extension reused the older railway line Pont de Fusta-Rafelbunyol, of which part was scrapped (between Pont de Fusta - Sant Llorenç - El Palmaret), and the rest was switched from 750 V to 1500 V.

Further alterations followed five years later. On 16 September 1998, line 2 was merged with line 1, and Line 3 was extended from Alameda to Avinguda del Cid in the west and Torrent in the south with some trains only going as far as Jesús. Half a year later, on 20 May 1999, line 3 was extended from Avinguda del Cid to Mislata-Almassil.

Lines 5 and 6, and more extensions[]

Many stations have an artistic exhibit in the entrance hall. This one is in Benimaclet.

In April 2003, the new line 5 was opened. This line took over the previous line 3 connection from Alameda to Torrent, together with a newly constructed branch from Alameda to Ayora 2.3 kilometres (1.4 mi). (Although some very early morning trains still travel from Machado to Torrent, this is not represented on maps.) One year later, the new line 5 was extended, together with line 1, from Torrent to Torrent Avinguda, a distance of 2.3 kilometres (1.4 mi). On 3 October 2005, Bailén station was opened on line 5. This station is between Colón and Jesús, and has connections with València-Nord, the main railway station of València. Furthermore, Bailen is close to the Plaça d'Espanya station on line 1. In October 2005, line 4 was extended to Mas del Rosari, and on 20 December 2005 to Lloma Llarga-Terramelar.

On 2 April 2007, Line 5 was extended to the east to a new station Marítim-Serrería (originally planned as Jerónimo Monsoriu).

On 18 April 2007, Line 5 extended to the airport (Aeroport Station) in the west and to the port (Marina Real Juan Carlos 1 Station, originally called Neptú station) in the east, this last section from Marítim-Serreria to Marina Real Juan Carlos 1 is a tram section; the trains go from Aeroport to Marítim-Serrreria and then a tram operates between Marítim-Serreria and Marina Real Juan Carlos 1; the tram is now denoted as Line 8. Line 3 was extended to the Airport as well to cover the schedule limitations of line 5 to Aeroport station.

On 22 September 2007, Line 6 was opened, linking the neighbourhoods of and Torrefiel to the metro system for the first time. Additionally a new station "Torre del Virrei" was added to Line 1. It is situated between the stations of "L'Eliana" and "La Pobla de Vallbona".

On 12 December 2010, the two overground stations on Lines 3 and 9 in the municipality of Alboraya, Alboraya and Palmaret, were replaced by the subterranean stations of Alboraya - Peris Aragó and Alboraya - Palmaret. On Line 1, the station of Jesus was renamed Joaquin Sorolla, while the Hospital station was renamed Safranar.

On 6 March 2015, a 4-station extension to Riba-roja de Túria was opened. This followed the path of a regional train line, which had been closed in 2005.[10]

In April 2015, the metro map was redrawn, with several of the branches split into separate lines, increasing the number of lines to 9.[11]

On 1 February 2022, the number of fare zones was reduced from four to two, as part of a reduction in ticket prices, with a fare supplement applying to Airport station.[12] Twenty one stations will change their name in 2022, eliminating Spanish language names in favour of Valencian language names. The changes will take effect when Line 10 opens.[13]

Accidents[]

Accident occurred on 9 September 2005

Between 2002 and the first quarter of 2012, 83 accidents had occurred on the network, costing the lives of 56 people.[14]

On 9 September 2005, two trains crashed into each other on Line 1. Nobody was killed, but according to early reports 35 people were injured, 4 of whom were taken to hospital, their condition described as serious. The first train had been stationary waiting for a red signal. The second used its emergency brakes to avoid a collision, but was hit by a third train. The force of the impact severely damaged the drivers' cabs at the front of the last train and at the rear of the second train. The crash occurred between Paiporta and Picanya about 5 km south-east of the city centre. The 3729 and 3730 EMUs are now a single EMU with 3729A and the 3730A cars, the 'B' cars were severely damaged and are currently at València-Sud workshop, waiting to be scrapped.

The date 3 July 2006 was a dark day for the Valencia metro. In a severe accident, a two-car EMU derailed between Jesús and Plaça d'Espanya stations. At least 43 people were killed and 47 injured. It was the worst metro accident in Spanish history.

Future service[]

Metrovalencia map with proposed expansions

Line 9 is planned to be extended to the centre of Riba-roja de Túria. A tunnel will be built between Bailén and Alameda stations, with a new station near Valencia city hall, in order to improve service frequency. Four more lines are planned.[15]

Terminals Service type Comments
Line 10

Alacant - Natzaret

Underground + tramway To open in April or May 2022.[16]
Line 11

Alacant - Marina Real

Tramway Under construction. Planned for 2023
Line 12

Alacant - Hospital La Fe

Underground + tramway Under construction. Planned for 2025
Line 14

Barri del Crist - Maritim

Underground + tramway Planned for after 2030. Will create 8 stations in Valencia's La Llum district, and the towns of Xirivella, Alaquàs, Aldaia and Quart de Poblet's Barri del Crist.

Postponed and cancelled extensions[]

Map showing expansions planned in 2006

In 2006, the Generalitat Valenciana proposed a number of new lines and extensions which were abandoned due to lack of funds after the financial crisis of 2007–2008.[17]

Extension from Alacant to Tavernes Blanques[]

The future Line 10 was originally to have run underground through Ciutat Vella (Valencia's historic centre) before emerging at surface level at Pont de Fusta station and continuing to Tavernes Blanques. One station on this line, Mercat Central, began construction in 2007 and was completed at a cost of 2.7 million euros, but remains a ghost station. In March 2021, the director of Valencian railways said that the project had been abandoned and that a decision would be taken on how to use the completed station.[18]

Extension to Vilamarxant[]

Plans were made for an extension of Line 9 to Vilamarxant. However, by 2015, the plans had been abandoned.[19]

Orbital line[]

This would have been a tram line connecting Valencia's north and south boulevards with the towns of Alboraya, Mislata and Xirivella. It would have brought metro service to Valencia's Tres Forques, L'Olivereta and Malilla districts. Only a small part of the line was constructed through Valencia's Torrefiel and Orriols districts and opened as part of the new Line 6 in September 2007.[17]

Horta Sud light metro[]

This line, initially designated as line 8, would have begun at La Fe. It would have run through Valencia's district of La Torre and the towns of Sedaví, Alfafar and Benetússer before dividing into two. The southern branch would have gone through Massanassa, Catarroja, Albal, Beniparrell before terminating in Silla. The western branch was to run through Paiporta, Torrent, Alaquàs and Aldaia. It would then have split into 2 further branches. One would have terminated at Bonaire shopping centre with the other continuing through Quart de Poblet to the terminus at Faitanar.[17]

Coastal tram[]

The coastal tram (es), originally designated as Line 10, would have connected Alboraya's Port Saplaya and Patacona beach with Valencia's Malvarosa and Las Arenas beaches before terminating at Marítim station.[17]

Network map[]

See also[]

Notes[]

  1. ^ Local pronunciation:
    Valencian: [ˌmetɾovaˈlensia]
    Spanish: [ˈmetɾoβaˈlenθja]

References[]

  1. ^ a b c d e f "FGV en cifras > Metrovalencia en cifras > Datos de la red de Metrovalencia" [FGV figures > Metrovalencia figures > Data on the Metrovalencia network] (in Spanish). FGV. 2014.
  2. ^ a b "Metrovalencia alcanza los 69,4 millones de viajeros en 2019, la cifra "más alta de su historia"". La Vanguardia (in Spanish). 18 January 2020. Retrieved 3 April 2020.
  3. ^ "El metro de Valencia pone en marcha el sistema de conducción automático" (in Spanish). Retrieved 14 May 2014.
  4. ^ "Conversion Of Railway Lines For Suburban Passenger Services" (pdf). The World Bank. Retrieved 7 May 2011.
  5. ^ Valencia metro at urbanrail.net, accessed 5 July 2015
  6. ^ FGV prevé el cierre de líneas y la venta de estaciones para ahorrar 29,3 millones (in Spanish), Levante, 3 January 2013.
  7. ^ Metrovalencia desplazó 63'1 millones de pasajeros en 2012, un 3% menos (in Spanish), ABC, 6 January 2013.
  8. ^ "Estadística de Transporte de Viajeros" [Passenger Transport Statistics]. Ine.es (in Spanish). Instituto Nacional de Estadística [National Statistics Institute]. Archived from the original on 26 September 2015. Retrieved 30 November 2015.
  9. ^ Metrovalencia alcanza los 60,6 millones de viajeros en 2015 y supera los conseguidos el año anterior, 20minutos.es, 23 January 2016, accessed 19 May 2016
  10. ^ La línea de metro a Ribarroja entrará en servicio el 6 de marzo (in Spanish), Las Provincias, 2 March 2015.
  11. ^ Así serán las nuevas líneas de Metrovalencia (in Spanish), ABC, 27 November 2014.
  12. ^ "El Metro de Valencia tendrá solo dos zonas tarifarias a partir de enero de 2022" [Metrovalencia will only have 2 fare zones after January 2022]. ABC (in Spanish). Spain. 30 November 2021. Retrieved 19 February 2022.
  13. ^ "Las 21 estaciones y paradas de Metrovalencia que cambian de nombre" [The 21 Metrovalencia stations that will change their name]. Las Provincias (in Spanish). Spain. 1 December 2021. Retrieved 19 February 2022.
  14. ^ La red de Metrovalencia ha sufrido 83 accidentes con 56 fallecidos desde 2002 (in Spanish), El Pais, 5 June 2013.
  15. ^ Vazquez, C (29 December 2021). "Un segundo túnel entre las estaciones de Bailén y Alameda mejorará las frecuencias del metro" [A second tunnel between Bailén and Alameda stations will improve service frequency]. El País (in Spanish). Spain. Retrieved 19 February 2022.
  16. ^ Obrador, JL (24 January 2022). "La línea 10 de Metrovalencia ya está casi acabada y comenzará a funcionar "en abril o mayo"" [Metrovalencia Line 10 is almost finished and will begin operations in April or May]. 20minutos.es (in Spanish). Spain. Retrieved 19 February 2022.
  17. ^ a b c d Carlos, NC (30 December 2013). "La crisis deja en el olvido hasta siete proyectos de transporte público en Valencia" [The crisis resulted in up to 7 public transport projects in Valencia being forgotten]. 20minutos.es (in Spanish). Spain. Retrieved 19 February 2022.
  18. ^ Navarro Castelló, Carlos (11 March 2021). "FGV no contempla que la Línea 10 del metro atraviese el centro de València y busca alternativas para la estación fantasma del Mercat Central" [FGV doesn't plan to continue Line 10 through the centre of Valencia and is looking for alternatives for the Mercat Central ghost station]. elDiario.es (in Spanish). Spain. Retrieved 19 February 2022.
  19. ^ Domingo, Isabel (29 October 2018). "Las promesas olvidadas del metro de Valencia" [The forgotten promises of Metrovalencia]. Las Provincias (in Spanish). Spain. Retrieved 19 February 2022.