Sukhumvit line

From Wikipedia, the free encyclopedia
BTS Sukhumvit line
BTSbangkok.svg
Bangkok Skytrain 2011.jpg
Overview
Native nameสายสุขุมวิท
LocaleBangkok, Samut Prakan Province, and Pathum Thani Province
TerminiKhu Khot
Kheha
Stations47
Service
TypeRapid transit
SystemBTS Skytrain
Depot(s)Mo Chit, Kheha, Khu Khot
History
Opened5 December 1999
Technical
Line length53.58 km (33.29 mi)
Number of tracks2
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification750 V DC third rail
Route map

Legend
Khu Khot
Yaek Kor Por Aor
Royal Thai Air Force Museum
Bhumibol Adulyadej Hospital
Saphan Mai
Sai Yud
Phahon Yothin 59
Wat Phra Sri Mahathat
11th Infantry Regiment
Bang Bua
Royal Forest Department
Kasetsart University
Sena Nikhom
Ratchayothin
Phahon Yothin 24
Ha Yaek Lat Phrao
 MRT 
Blue Line to Lak Song
Main depot
Mo Chit
 MRT 
Saphan Khwai
(future)
Ari
Sanam Pao
Si Rat Expressway
Victory Monument
Phaya Thai
ARLbangkok.svg  ARL 
Airport Rail Link to Suvarnabhumi
SRT Eastern Line
to Bangkok │ to Chachoengsao
Ratchathewi
Silom Line to National Stadium
Siam
 BTS 
Silom Line to Bang Wa
Chit Lom
Phloen Chit
Chaloem Maha Nakhon Expressway
Nana
Asok
Blue Line to Tha Phra (via Bang Sue)
Phrom Phong
Thong Lo
Ekkamai
Phra Khanong
Chalong Rat Expressway
On Nut
Bang Chak
Punnawithi
Udom Suk
Chaloem Maha Nakhon Expressway
Third stage Expressway System
Bang Na
Bearing
Samrong
Pu Chao
Kanchanapisek Expressway
Chang Erawan
Royal Thai Naval Academy
Pak Nam
Srinagarindra
Phraek Sa
Sai Luat
Kheha

The Sukhumvit line (Thai: รถไฟฟ้า สายสุขุมวิท) or Light Green line, is an elevated metro rail line of the BTS Skytrain in Bangkok, Thailand. From the central Siam Station, where it connects with the Silom Line, the line runs both northwards along Phaya Thai and Phahon Yothin Roads to Khu Khot in Lam Luk Ka District in Pathum Thani, and eastwards along Rama I, Phloen Chit and Sukhumvit Roads, through Bang Na District to Kheha Station in Samut Prakan. BTS daily ridership (2019) is 740,000 passengers per day.[1]

History[]

The first part of the line opened in December 1999 and consisted of seventeen stations from Mo Chit to On Nut. Currently, there are 47 stations in operation. Its formal name is The Elevated Train in Commemoration of HM the King's 6th Cycle Birthday 1st line (Thai: รถไฟฟ้าเฉลิมพระเกียรติ 6 รอบพระชนมพรรษา สาย 1).[2]

Stations[]

A planned station at N6 has never been built.

Code Station Name Transfers Location
English Thai
BTS N24.svg Khu Khot คูคต Lam Luk Ka Pathum Thani
BTS N23.svg Yaek Kor Por Aor
(RTGSYaek Kho Po O)
แยก คปอ Don Mueang Bangkok
BTS N22.svg Royal Thai Air Force Museum
(RTGSPhiphithaphan Kong Thap Akat)
พิพิธภัณฑ์กองทัพอากาศ Don Mueang Airport People Mover (Planned)
BTS N21.svg Bhumibol Adulyadej Hospital
(RTGSRong Phayaban Phumiphon Adunyadet)
โรงพยาบาลภูมิพลอดุลยเดช
BTS N20.svg Saphan Mai สะพานใหม่ Bang Khen
BTS N19.svg Sai Yud
(RTGSSai Yut)
สายหยุด
BTS N18.svg Phahon Yothin 59
(RTGSPhahon Yothin Ha Sip Kao)
พหลโยธิน 59
BTS N17.svg Wat Phra Sri Mahathat
(RTGSWat Phra Si Mahathat)
วัดพระศรีมหาธาตุ  MRL  (under construction)
BTS N16.svg 11th Infantry Regiment
(RTGSKrom Thahan Rap Thi Sip Et)
กรมทหารราบที่ 11
BTS N15.svg Bang Bua บางบัว Chatuchak
BTS N14.svg Royal Forest Department
(RTGSKrom Pa Mai)
กรมป่าไม้
BTS N13.svg Kasetsart University
(RTGSMaha Witthayalai Kasetsat)
มหาวิทยาลัยเกษตรศาสตร์
BTS N12.svg Sena Nikhom เสนานิคม
BTS N11.svg Ratchayothin รัชโยธิน
BTS N10.svg Phahon Yothin 24
(RTGSPhahonyothin Yisip Si)
พหลโยธิน 24
BTS N9.svg Ha Yaek Lat Phrao ห้าแยกลาดพร้าว  MRT  Phahon Yothin
BTS N8.svg Mo Chit หมอชิต  MRT  Chatuchak Park
BTS N7.svg Saphan Khwai สะพานควาย Phaya Thai
BTS N6 opaque.png เสนาร่วม[3]
BTS N5.svg Ari อารีย์
BTS N4.svg Sanam Pao สนามเป้า
BTS N3.svg Victory Monument
(RTGSAnusawari Chai Samoraphum)
อนุสาวรีย์ชัยสมรภูมิ Ratchathewi
BTS N2.svg Phaya Thai พญาไท ARLbangkok.svg  ARL   SRT  (planned)
BTS N1.svg Ratchathewi ราชเทวี
BTS CEN.svg Siam
(RTGSSayam)
สยาม  BTS  Pathum Wan
BTS E1.svg Chit Lom ชิดลม
BTS E2.png Phloen Chit เพลินจิต  MRL  (proposed)
BTS E3.svg Nana นานา Khlong Toei and
Watthana
BTS E4.svg Asok อโศก  MRT  Sukhumvit
BTS E5.svg Phrom Phong พร้อมพงษ์
BTS E6.svg Thong Lo ทองหล่อ
BTS E7.svg Ekkamai เอกมัย
BTS E8.svg Phra Khanong พระโขนง
BTS E9.svg On Nut อ่อนนุช
BTS E10.svg Bang Chak บางจาก Phra Khanong
BTS E11.svg Punnawithi ปุณณวิถี
BTS E12.svg Udom Suk อุดมสุข  BTS  (proposed) Bang Na
BTS E13.svg Bang Na บางนา
BTS E14.svg Bearing
(RTGSBaering)
แบริ่ง
BTS E15.svg Samrong สำโรง  MRL  (under construction) Mueang Samut Prakan Samut Prakan
BTS E16.svg Pu Chao ปู่เจ้า
BTS E17.svg Chang Erawan ช้างเอราวัณ
BTS E18.svg Royal Thai Naval Academy
(RTGSRongrian Nairuea)
โรงเรียนนายเรือ
BTS E19.svg Pak Nam ปากน้ำ
BTS E20.svg Srinagarindra
(RTGSSi Nakharin)
ศรีนครินทร์
BTS E21.svg Phraek Sa
(RTGSPhraekkasa)
แพรกษา
BTS E22.svg Sai Luat สายลวด
BTS E23.svg Kheha เคหะฯ

Services[]

BTS operates services throughout the line from Khu Khot to Kheha at all times. At peak hours some services run terminate at Mo Chit northbound, and at Samrong, eastbound. Trains run generally at three to six-minute intervals. The last eastbound trains from Khu Khot terminate at Kheha, Samrong or Ha Yaek Lat Phrao. The last northbound trains from Kheha terminate at Khu Khot, Mo Chit, or Samrong.

A few off-peak eastbound trains run a through service on the Silom Line to Bang Wa, in order to increase the line capacity at peak hours. At night, these trains will run back northbound and head to depot.[4] Some late northbound trains on the Silom line switch to the Sukhumvit line at Siam to reach the depot at Mo Chit.

Extensions and current construction[]

Station sign at Thong Lo BTS station shows the extension beyond Samrong which opened in 2018.

Summary of BTS Sukhumvit extensions

  • 12 August 2011: On Nut (E09) – Bearing (E14)
  • 3 April 2017: Bearing (E14) – Samrong (E15)
  • 6 December 2018: Samrong (E15) – Kheha (E23)
  • 9 August 2019: Mo Chit (N8) – Ha Yaek Lat Phrao (N9)
  • 4 December 2019: Ha Yaek Lat Phrao (N9) – Kasetsart University (N13)
  • 5 June 2020: Kasetsart University (N13) – Wat Phra Sri Mahathat (N17)
  • 16 December 2020 Wat Phra Sri Mahathat (N17) – Khu Khot (N24).

East[]

1st extension to Bearing Construction started in August 2006 on a four billion baht, 5.25 km extension from On Nut (E9) to Bearing.[5] The extension was funded by the BMA.[6] The original scheduled opening date was mid-2009. However, a delay in tendering of the contract for the electrical and signalling works resulted in a two-year delay.

The extension did not open until over two years later, on 12 August 2011. The delay in opening prompted the BMA to offer free travel for this extension until the end of 2011 as compensation. An additional flat fee is charged additionally to the distance-based fare of the rest of the BTS network.

2nd extension to Kheha Construction started in April 2012 on a 12.6 km, nine station extension from Bearing station to Kheha station. The extension was funded by the MRTA as it is outside BMA city limits, Bangkok Province. Construction was contracted to take 1,350 days and the extension was originally scheduled to open by early 2017. In April 2013, the MRTA awarded Ch Karnchang the contract for track laying and electrical systems.[7]

In June 2014, civil works were stated to be 28.3 percent complete. In August 2016, the BMA agreed to take over the operation of the extension from MRTA. Delays over the agreement of how much the BMA should pay MRTA caused a delay in the commencement of test runs on the extension. Track works were 98% completed by November 2016. The total cost of the extension was estimated at 21.4 billion baht.[8] In January 2017, it was announced that the opening of the extension could be further delayed to 2018-2019 due to budgetary concerns and ongoing disputes between the MRTA and BMA.[9]

The first 1.2 km section of the extension to Samrong station (E15) opened on 3 April 2017.[10] The full extension to Kheha opened on 6 December 2018.[11]

North[]

Map of North Extension at Thong Lo station. Station N9 was opened on 9 August 2019 and stations N10 to N24 opened in 2020.

1st and 2nd extension

  • 1) Mo Chit station to Saphan Mai: 11.4 km, 12 stations (N9–N20)
  • 2) Saphan Mai to Khu Khot: 7.5 km, four stations (N21-N24)

An 11.4 km, 11 station northern extension from Mo Chit station to Saphan Mai in Don Mueang District had been planned since the Sukhumvit line opened. Originally, this extension was scheduled to be completed by 2008. However, due to a combination of changes in government, a prolonged environmental study, and problems with locating a suitable train depot the extension was continually delayed. A further 16.5 km, nine station extension from Saphan Mai to Khu Khot was also planned once the extension to Saphan Mai had been completed.

After multiple delays, in mid-2013 a decision was made to tender extensions (1) and (2) at the same time, by the end of 2013. However, the dissolution of parliament in November 2013 delayed this yet again. A tender was finally released in January 2014[12] with an April deadline before being delayed until late May 2014 due to concerns from bidders.[13] A military coup in late-May 2014 suspended the bidding process whilst the military administration reviewed all major projects. In late June, the military administration affirmed that the tender would proceed before the end of 2014. In August 2014, the MRTA announced that the new tender deadline was 30 September 2014.[14] Five bidders qualified and the successful bids were announced in December 2014.[15] The tender specified a construction period of 1,350 days.

On 3 April 2015, MRTA signed four contracts for this extension:[16]

  • Contract 1: Civil works of 11.4 km from Mo Chit to Saphan Mai, will be constructed by Italian-Thai Development (15,269 million baht)
  • Contract 2: Civil works of 7.5 km from Saphan Mai to Khu Khot, will be constructed by UN-SH-CH joint venture (6,657 million baht)
  • Contract 3: Civil works of Depot and Park and Ride building, will be constructed by STEC-AS joint venture (4,019 million baht)
  • Contract 4: Tracklaying and system design, will be constructed by STEC-AS joint venture (2,841 million baht)

The MRTA, contactors and Thai Traffic Police met on 2 September 2015 and confirmed construction would begin on 8 September 2015. A flyover at Kasetsart was demolished, which commenced on 12 September 2015.[17]

At 31 December 2017, the progress of civil works construction was at 53.31% according to the MRTA.[18] As of the end of April 2018, the MRTA stated that civil works progress had advanced to 63.27%.[19] As of 30 September, overall construction had progressed to 78.79%.[20] By the end of March 2019, civil construction had nearly been completed having progressed to 99.42%.[21]

Testing of the final 9.8 km, 7 station section from Wat Phra Sri Mahathat (N17) to Khu Khot (N24) began on 5 October and will continue until the full extension opens.[22] The final section will be officially opened on 16 December 2020 by the Prime Minister.[23]

Opening dates

  1. The first section to Ha Yaek Lat Phrao station (N9) opened on 9 August 2019.
  2. The next 4 stations from a Yaek Lat Phrao station (N9) to Kasetsart University (N13) opened on 4 December 2019.
  3. The next 4 stations from Kasetsart University (N13) to Wat Phra Sri Mahathat (N17) opened on 5 June 2020.
  4. The remaining section of 9.8 km and 7 stations from Wat Phra Sri Mahathat (N17) to Khu Khot (N24) opened on 16 December 2020.

Future extension plans[]

East:

  • A further 7 km, four station extension from Kheha station to Bang Pu station is planned.
Code Station Name Transfers Location
English Thai
BTS E24 opaque.png Sawangkhaniwat สวางคนิวาส Mueang Samut Prakan Samut Prakan
BTS E25 opaque.png Mueang Boran เมืองโบราณ
BTS E26 opaque.png Si Chan Pradit ศรีจันทร์ประดิษฐ์
BTS E27 opaque.png Bang Pu บางปู

North:

  • A further 9 km, four station extension east along Lam Lukka Road from Khu Khot station to Wongwaen-Lam Luk Ka station is planned.
Code Station Name Transfers Location
English Thai
BTS N28 opaque.png Wongwaen-Lam Luk Ka วงแหวน-ลำลูกกา Lam Luk Ka Pathum Thani
BTS N27 opaque.png Khlong Ha คลองห้า
BTS N26 opaque.png Khlong Si คลองสี่
BTS N25 opaque.png Khlong Sam คลองสาม

See also[]

References[]

  1. ^ Limviphuwat, Phuwit (18 May 2019). "Mass Transit not keeping up". The Nation. Retrieved 18 May 2019.
  2. ^ "รถไฟฟ้าบีทีเอส (BTS Skytrain)".
  3. ^ Charuvastra, Teeranai; Chief, News (2019-04-10). "Construction of Sathorn BTS 'Ghost Station' Underway". Khaosod English. Retrieved 2020-03-25.
  4. ^ "เวลาการให้บริการ". BTS Skytrain.
  5. ^ Groundbreaking starts on new BTS extension, Daily News, 15 August 2006
  6. ^ BTS extension budget cut, Bangkok Post, 15 December 2006
  7. ^ "Ch Karnchang gets Phase 2 of Bearing-Samut Prakan route" The Nation, 13 April 2013
  8. ^ "BMA to postpone test run of Bearing-Samrong skytrain". Bangkok Post. Retrieved 2016-11-22.
  9. ^ Sasiwan Mokkhasen (2017-01-31). "Green Line Going Nowhere for at Least Two Years". Khaosod English. Retrieved 2017-02-25.
  10. ^ Asaree Thaitrakulpanich (2017-02-24). "First Station of Stalled BTS Green Line to Open April 1". Khaosod English. Retrieved 2017-02-25.
  11. ^ "MRTA pushes to fast-track launch of South Green Line". Bangkok Post. 1 December 2017.
  12. ^ http://www.mrta.co.th/sysRegister/register131217/proc17122556.pdf
  13. ^ http://www.prachachat.net/news_detail.php?newsid=1401076541 "รฟม.ปรับทีโออาร���หมอชิต-คูคต กลางปี59 เปิดให้บริการสายสีม่วง" Prachachat News, 26 May 2014
  14. ^ http://www.prachachat.net/news_detail.php?newsid=1408439328
  15. ^ http://www.matichon.co.th/news_detail.php?newsid=1412581507
  16. ^ http://www.ryt9.com/s/iq03/2130477
  17. ^ http://www.manager.co.th/iBizchannel/ViewNews.aspx?NewsID=9580000099688
  18. ^ https://www.mrta.co.th/th/news/information/ความก-าวหน-าการก-อสร-างรถไฟฟ-า-ณ-31-ธ-นวาคม-2560/. MRTA Press, 16 January 2018
  19. ^ https://www.mrta.co.th/th/news/information/ความก-าวหน-าการก-อสร-างรถไฟฟ-า-ณ-30-เมษายน-2561/. MRTA Press, 30 April 2018
  20. ^ https://www.facebook.com/MRTA.PR/photos/a.1433440196872710/2109998672550189/. MRTA Press, 12 October 2018
  21. ^ https://www.mrta.co.th/th/news/information/ความก-าวหน-าการก-อสร-างรถไฟฟ-า-ณ-30-เมษายน-2561/. MRTA Press, 30 April 2018
  22. ^ "BTS tests Green Line trains at 7 new stations before public opening at year-end". The Nation. 7 October 2020.
  23. ^ "นับถอยหลัง 4 ธ.ค. 63 รถไฟฟ้า BTS สายสีเขียว เปิดทุกสถานี เชื่อม 3 จังหวัด". TNN Thailand. 17 November 2020.
Retrieved from ""