Line 10 (Hangzhou Metro)

From Wikipedia, the free encyclopedia
Line 10
 10 
Overview
StatusUnder construction
OwnerCity of Hangzhou
LocaleHangzhou, Zhejiang
Termini
Stations13
Service
TypeRapid transit
SystemHangzhou Metro
Services1
Operator(s)Hangzhou Metro Corporation
Depot(s)Renhe Depot
Rolling stock6 cars, type A
History
Planned opening2022
Technical
Line length15.18km
CharacterUnderground
ElectrificationOverhead, 1,500 V DC
Operating speed80km/h (50mph)
Line 10 drawn to scale.

Line 10 of the Hangzhou Metro (simplified Chinese: 杭州地铁十号线; traditional Chinese: 杭州地鐵十號線; pinyin: Hángzhōu Dìtiě Shíhào Xiàn) is a subway line under construction. The line will be 15.2 km (9.4 mi) long and will run between station in Xihu District and station in Yuhang District up in the north, passing through west Hangzhou. Phase 1 of the line is expected to be operational by end of 2022.

Stations[]

Station name[1] Connections
English Chinese

(reserved station)
浙大
黄龙体育中心  3 
文三路  Airport 
Xueyuan Road 学院路  2 
翠柏路
北大桥
Hemu 和睦  5 
花园岗
渡驾桥
祥园路
杭行路  4 
金德路
逸盛路   

References[]

  1. ^ "杭州市人民政府关于杭州地铁10号线一期工程车站站名的批复". 2021-03-19.
Retrieved from ""