Line 5 (Hangzhou Metro)

From Wikipedia, the free encyclopedia
Line 5
 5 
201906245号线列车离开大运河站.jpg
Train of Line 5 departing The Grand Canal Station
MTR Hangzhou Logo.jpg
Overview
StatusOperational
OwnerCity of Hangzhou
LocaleHangzhou, Zhejiang, China
TerminiYuhang Town
Guniangqiao
Stations40
(38 in service)
Service
TypeRapid transit
SystemHangzhou Metro
Services1
Operator(s)MTR Corporation (Hangzhou)[1]
Depot(s)Wuchang Depot
Guniangqiao Stabling Yard
Rolling stock6 cars, Type AH
History
Opened24 June 2019; 2 years ago (2019-06-24)[2]
Technical
Line length56.21 km (34.93 mi)[3]
CharacterUnderground
ElectrificationOverhead line, 1,500 V DC
Operating speed80km/h (50mph)

Line 5 of the Hangzhou Metro (simplified Chinese: 杭州地铁五号线; traditional Chinese: 杭州地鐵五號線; pinyin: Hángzhōu Dìtiě Wǔhào Xiàn) is a subway line in Hangzhou. The line is colored cyan on system maps.

Opening timeline[]

Segment Commencement Length Station(s) Name
Liangmu Road — Shanxian 24 June 2019 17.76 kilometres (11.04 mi) 12 Phase 1 (initial section)
Shanxian — Guniangqiao 23 April 2020 36.16 kilometres (22.47 mi) 21 Phase 1 (final section)
Jinxing — Liangmu Road 23 April 2020 4 Phase 2
South Railway Station[4] 30 June 2020 Infill station 1

Stations[]

Hangzhou Metro Line 5.svg
Station name Connections Distance
km
Location
English Chinese
老余杭 Yuhang
Jinxing 金星
Lvting Road 绿汀路  16 
Gexiang 葛巷
Chuangjing Road 创景路
Liangmu Road 良睦路
Cangqian Campus Hangzhou Normal University 杭师大仓前
Yongfu 永福
Wuchang 五常
Jiangcun 蒋村 Xihu
Zijingang Campus Zhejiang University 浙大紫金港
Sanba 三坝  2 
Pingshui Street 萍水街 Gongshu
Hemu 和睦
The Grand Canal 大运河
East Gongchen Bridge 拱宸桥东
Shanxian 善贤  3 
Xiwen Street 西文街 Xiacheng
Xiangjisi Road 香积寺路
Hangyang 杭氧
Datieguan 打铁关  1 
宝善桥
North Jianguo Road 建国北路  2 
Wan'an Bridge 万安桥 Shangcheng
Chengzhan 城站  1 
China Railway Hangzhou
Jiangcheng Road 江城路
Houchaomen 候潮门
Nanxingqiao 南星桥  4 
Changhe 长河  6  Binjiang
Jucai Road 聚才路
Jianghui Road 江晖路
Binkang Road 滨康路  1 
Bo'ao Road 博奥路 Xiaoshan
Jinji Road 金鸡路
People's Square 人民广场  2 
North Yucai Road 育才北路
Middle Tonghui Road 通惠中路
South Railway Station 火车南站 China Railway Hangzhounan
 Shaoxing TNT 
Shuangqiao 双桥
Guniangqiao 姑娘桥  1  (Shaoxing Metro)

Description[]

Phase 1 of the line is 48.6 km (30.2 mi) long with 36 stations and will run between Central Park station in Yuhang District and Xiangzhang Road station in Xiaoshan District in the east, passing through downtown Hangzhou and providing transfers with multiple other lines in the system including Hangshao line (through operation to Line 1 of the neighboring Shaoxing Metro).[5] Phase 2 of the line further extends 3.2 km and two stations east to Lvting Road.[6] A 5 km (3.1 mi), two station extension west to Laoyuhang station in Yuhang District started construction in 2018.[7]

Rolling stock[]

The line uses higher capacity six car Type AH trains which are 20cm wider than the Type B trains used in other Hangzhou Metro lines, increasing capacity by about 10%.[8]

References[]

  1. ^ "MTR : Concession Agreement for Hangzhou Metro Line 5 Signed". marketscreener.com. Retrieved 27 February 2019.
  2. ^ "快不快好不好?杭州地铁5号线首通段初体验-浙江在线杭州在线网站".
  3. ^ "杭州地铁5号线后通段、16号线计划4月底通车". 2020-03-27. Retrieved 2020-04-19.
  4. ^ "明天上午10点,下宁桥站、火车南站站同步开通!". 2020-06-29.
  5. ^ "杭州地铁5号线开工 余杭未来科技城3个车站率先建 - 杭网原创 - 杭州网". ori.hangzhou.com.cn. Archived from the original on 2014-12-20. Retrieved 2019-02-06.
  6. ^ "运营中的杭州地铁1号线底下 5号线悄悄穿过 - 杭州网 - 杭州新闻中心". hznews.hangzhou.com.cn. Retrieved 2019-02-06.
  7. ^ "地铁5号线确定向西延伸 期���明年完工". zj.zjol.com.cn. Retrieved 2019-02-06.
  8. ^ "杭州地铁5号线"小青"已抵达杭州 预计今年年底开通 - 杭网原创 - 杭州网". ori.hangzhou.com.cn. Retrieved 2019-02-06.
Retrieved from ""