Line 6 (Hangzhou Metro)
Line 6 | |
---|---|
6 | |
Overview | |
Status | Partially operational |
Owner | City of Hangzhou |
Locale | Hangzhou, Zhejiang |
Termini | Goujulong Shuangpu West Guihua Road |
Stations | 36 (34 in service) |
Service | |
Type | Rapid transit |
System | Hangzhou Metro |
Services | 2 |
Operator(s) | Hangzhou Metro Corporation |
Depot(s) | Shuangpu Depot Fengbei Stabling Yard Songjiatang Depot |
Rolling stock | 6 cars, type AH |
History | |
Opened | 30 December 2020 |
Technical | |
Line length | 58.5 km (Phase 1: 27.0 km, Phase 2: 8.3 km, Fuyang: 23.2 km) |
Character | Underground |
Track gauge | 1,435mm |
Electrification | Overhead line, 1,500 V DC |
Operating speed | 100km/h (62mph) |
Line 6 | |||||||
---|---|---|---|---|---|---|---|
Simplified Chinese | 杭州地铁六号线 | ||||||
Traditional Chinese | 杭州地鐵六號線 | ||||||
|
Line 6 (Chinese: 杭州地铁6号线) is a partially operational subway line of the Hangzhou Metro. The line runs from Shuangpu (in Xihu District) and West Guihua Road (in Fuyang District), merging at Xiangshan Campus, China Academy of Art station, stretching through the south bank of Qiantang River before turning northwest and ending at Goujulong. It connects Fuyang District with Binjiang, , Qianjiang Century City and Hangzhou East Railway Station. The line is 58.75 km (36.51 mi) long.
Phase 1 and Fuyang Section was opened on 30 December 2020.[1] Phase 2 opened on November 6, 2021.[2] The line's color is blue. In future planning, the stations from Shuangpu to Xiaming Street will merge to Line 12.
Opening timeline[]
Segment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
Shuangpu — Qianjiang Century City | 30 December 2020 | 26.95km | 17 | Phase 1 |
Xiangshan Campus, CAA — West Guihua Road | 23.47km | 11 | Fuyang Section (former Fuyang Line) | |
Zhipu Road | 29 April 2021 | Infill station | 1 | |
Qianjiang Century City — Goujulong | 6 November 2021[2] | 8.4 km[3] | 5 | Phase 2[2] |
Stations[]
See also[]
References[]
- ^ "4条地铁同时开通!杭州十城区实现地铁全覆盖". baijiahao.baidu.com. Retrieved 2021-01-01.
- ^ a b c d "来了!6号线二期明天开通,"证件照"抢先看". 2021-11-05. Archived from the original on 2021-11-05.
- ^ "火车东站将迎来四地铁时代!地铁6号线二期开通在即,暂时无法与1、4号线站内换��". 2021-10-22.
Categories:
- Hangzhou Metro lines
- Railway lines opened in 2020
- Standard gauge railways in China
- 2020 establishments in China