Line 3 (Ningbo Rail Transit)
Line 3 | |||
---|---|---|---|
3 | |||
![]() Line 3 platform of | |||
Overview | |||
Status | Operational | ||
Owner | Ningbo | ||
Locale | Ningbo, Zhejiang, China | ||
Termini | Datong Bridge | ||
Stations | 15 | ||
Service | |||
Type | Rapid transit | ||
System | Ningbo Rail Transit | ||
Operator(s) | Ningbo Rail Transit Co.,Ltd. | ||
History | |||
Opened | 30 June 2019[1] | ||
Technical | |||
Line length | 16.73 km (10.40 mi)[1] | ||
Number of tracks | 2 | ||
Character | Underground | ||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) | ||
|
Line 3 of Ningbo Rail Transit (Chinese: 宁波轨道交通3号线) is a rapid transit line in Ningbo. It starts from south Yinzhou District and ends in Datong Bridge Station in Jiangbei District. In the future extension plan, the line will further extend into Luotuo Area in Zhenhai District.[2] The construction of the first section, from south Yinzhou to Datong Bridge, started on 23 December 2014.[3]
Route[]
Line 3 starts from Gaotang Bridge Station in south Yinzhou District as an underground line. Then it turns into east-west direction on Yinzhou Avenue and makes a further turn into Ningnan South Road and goes in north-south direction again until it reaches Songjiang Middle Road. Then it runs to northeast to Qiubi and then crosses Yongtaiwen Railway from which it goes in north-south direction and extends along Zhongxing Road until it crosses Yongjiang River and reaches its destination, Datong Bridge Station.[4]
Opening timeline[]
Segment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
Datong Bridge — Gaotang Bridge | 30 June 2019[1] | 16.73 km (10.40 mi)[1] | 15 | Line 3 (Phase 1) |
Stations[]
Section | Station name | Connections | Distance km |
Location | ||
---|---|---|---|---|---|---|
English | Chinese | |||||
Line 3 | Datong Bridge | 大通桥 | 2 | Jiangbei | ||
Zhongxing Bridge South | 中兴大桥南 | Yinzhou | ||||
Minglou | 明楼 | |||||
Sports Center | 体育馆 | |||||
Sakura Park | 樱花公园 | 1 | ||||
儿童公园 | 4 | |||||
仇毕 | ||||||
钱湖北路 | ||||||
锦寓路 | ||||||
四明中路 | ||||||
鄞州区政府 | 5 | |||||
南部商务区 | ||||||
鄞州客运总站 | ||||||
句章路 | ||||||
高塘桥 | ||||||
Yinfeng line (through operation) | 姜山 | |||||
狮山 | ||||||
明辉路 | ||||||
朝阳 | ||||||
方桥 | Fenghua | |||||
琎琳 | ||||||
南渡 | ||||||
大成东路 | ||||||
金海路 | ||||||
References[]
![]() |
Wikimedia Commons has media related to Line 3, Ningbo Rail Transit. |
- ^ a b c d "3号线一期6月30日试运营 宁波轨道交通进入"多线时代"-浙江新闻-浙江在线".
- ^ "我委批复轨道交通3号线一期工程可行性研究报告". Ningbo Municipal Development & Reform Commission (in Chinese). November 3, 2014. Archived from the original on November 4, 2014.
- ^ "宁波地铁3号线一期开工 2019年试营". qjwb.com.cn (in Chinese). December 23, 2014. Archived from the original on December 23, 2014.
- ^ China Railway Siyuan Survey and Design Group, Environment impact report of Line 3, Ningbo Rail Transit, Wuhan, February, 2014
- Ningbo Rail Transit lines
- Railway lines opened in 2019
- 2019 establishments in China
- People's Republic of China rapid transit stubs