Yinfeng line

From Wikipedia, the free encyclopedia
Yinfeng Line
(鄞奉线)
NBRT Yinfeng Line icon.svg
Overview
Other name(s)Line S3 (S3号线)
Ningbo–Fenghua intercity railway
(宁波至奉化城际轨道交通)
Ningfeng line
(宁奉线)
StatusOperational
OwnerNingbo
LocaleNingbo, Zhejiang, China
Termini
Stations9
Service
TypeRapid Transit
SystemNingbo Rail Transit
Operator(s)Ningbo Rail Transit Co.,Ltd.
Rolling stock6-car Type B
History
Opened28 September 2019[1] (initial section)
27 September 2020[2] (entire line)
Technical
Line length21.53 km (13.38 mi)[2]
Number of tracks2
CharacterUnderground and Elevated
Track gauge1,435 mm (4 ft 8+12 in)
Operating speed80 km/h
(The section from Fangqiao to Jinhai Road reserved to be 120 km/h)

Yinfeng line of Ningbo Rail Transit (宁波轨道交通鄞奉线), also known as Ningbo–Fenghua Intercity Railway, Ningfeng line or Line S3, is a rapid transit line in Ningbo. It starts from in Yinzhou District and ends in in Fenghua District. Through train service is operated on both Line 3 and the Ningfeng Line.[3] Construction of Ningfeng Line started on December 30, 2015.[4] The initial section of the line (3 stations) opened on September 28, 2019. The remaining section of the line (6 stations) will open on September 27, 2020.[2]

Route[]

The railway starts south of Gaotang Bridge station in south Yinzhou District, goes south until it reaches the and turns into an elevated line and enters the Huanzhen North Road of Jiangshan Town. After reaching Jiangshan Station, it turns east into Yanhu Road and passes Yinzhou Industrial Park and Yongjiang Village until it reaches Fangqiao and turns south again along Donghuan Road before it reaches its destination, Jinhai Road Station.[5] The section between Fangqiao to Dacheng stations the elevated structure will run under the elevated south extension of the Ningbo Airport Expressway forming a three level structure similar to the northern section of Shanghai Metro Line 1.[6]

The route is 21.53 km in length,[2][7] of which 0.916 km is underground[7] with the rest being elevated.

The line will running up to 80 km/h (the section from Fangqiao to Jinhai Road reserved to be 120 km/h).

It is proposed that in the future, this line will be divided at Fangqiao station: northern part will be integrated into Line 3 and southern part will be extended northwards until it finally reaches of Line 5. A further extension southwards into Ninghai County[3] and a branch line west to Xikou Town has also been proposed.[8]

Opening timeline[]

Segment Commencement Length Station(s) Name
Gaotang Bridge — Minghui Road 28 September 2019 5.61 km (3.49 mi)[1] 3 initial section
Minghui Road — Jinhai Road 27 September 2020[2] 15.92 km (9.89 mi) 6 remaining section

Stations[]

Section Station name Connections Distance
km
Location
English Chinese
Line 3 (through operation) Datong Bridge 大通桥  2  Jiangbei
Zhongxing Bridge South 中兴大桥南 Yinzhou
Minglou 明楼   
Sports Center 体育馆   
Sakura Park 樱花公园  1 
儿童公园  4 
仇毕
钱湖北路
锦寓路
四明中路
鄞州区政府  5 
南部商务区
鄞州客运总站
句章路
高塘桥
Yinfeng line 姜山
狮山
明辉路
朝阳
方桥 Fenghua
琎琳
南渡
大成东路
金海路

References[]

  1. ^ a b "官宣 定了!宁奉线首通段9月28日开通,与3号线一期贯通运营". Ningbo Rail Transit. 2019-09-19.
  2. ^ a b c d e "3号线鄞奉段、机场快速路南延南段、三官堂大桥9月27日开通". 2020-09-26.
  3. ^ a b China Railway Siyuan Survey and Design Group. Report of Environment Impact of Ningbo–Fenghua Intercity Railway. Wuhan. July 2015.
  4. ^ "Ningbo–Fenghua Intercity Railway begins construction and is scheduled to open in June, 2019". Ningbo PAI Client. December 30, 2015. Retrieved December 30, 2015.
  5. ^ "The route of Ningbo–Fenghua Intercity Railway is almost fixed. Construction expected to start next year". Ningbo Daily. July 9, 2014. Retrieved September 14, 2014.
  6. ^ "二层跑城铁三层跑汽车宁波至奉化快速路开建-宁波频道". nb.zjol.com.cn. Retrieved 2018-01-06.
  7. ^ a b "宁波市轨道交通2号线二期及宁波至奉化城际铁路工程后通段供电系统安装施工招标公告". 2018-06-29.
  8. ^ "宁波市奉化区人民政府门户网站". www.fh.gov.cn. Retrieved 2018-01-06.
Retrieved from ""