Jakarta LRT

From Wikipedia, the free encyclopedia
  (Redirected from )

Jakarta LRT
LRT Jakarta Logo.png
LRT Jakarta - Hyundai Rotem LRV in Boulevard Utara Station.jpg
Jakarta LRT at Boulevard Utara station
Overview
OwnerGovernment of Jakarta
LocaleJakarta, Indonesia
Transit typeLight rail
Number of lines1
Number of stations6 (first phase)
Websitewww.lrtjakarta.co.id
Operation
Began operation1 December 2019
Operator(s)PT LRT Jakarta
(PT Jakarta Propertindo)
CharacterElevated
Number of vehiclesEight two-car trainsets
Headway10 minutes
Technical
System length5.8 km (3.6 mi) (first phase)[1]
Track gauge1,435 mm (4 ft 8+12 in)[1]
Electrification750V (DC) third rail[2]
Top speed80 km/h (50 mph)

The Jakarta Light Rail Transit (Jakarta LRT) (Indonesian: Lintas Rel Terpadu Jakarta, lit. "Jakarta Integrated Rail Line") is one of the light rail systems in Jakarta, the capital city of Indonesia. It is being implemented by the Jakarta provincial government.[3] The first phase of the LRT, from Velodrome to Pegangsaan Dua, began commercial operations on 1 December 2019.[4]

Jakarta LRT is operated by PT LRT Jakarta, a subsidiary of municipally-owned property and infrastructure company PT Jakarta Propertindo (Jakpro).

Background[]

Hyundai Rotem LRV leaving Velodrome station during a limited trial run on 7 September 2018

The Jakarta light rail transit project aims to tackle Jakarta's high road traffic congestion.[5] The rolling stock comes from Hyundai Rotem from South Korea. Each trainset consists of two cars and will be able to carry 270 to 278 passengers. There will be a total of 16 cars.[1] Platform screen doors by ST Engineering Electronics will be installed at all stations. To build the site, BCA had disbursed 2.78 trillion rupiahs of their syndicated loans.[6]

A public trial run began on 11 June 2019 between Boulevard Utara and Velodrome stations, with free admission to registered ticket holders.[7] Since commercial operation began in December 2019, the "flagging" system has seen falling ridership, with an average of 4,364 passengers per day.[8]

Network[]

Operational[]

  • Jakarta LRT S.svg Phase 1 - Pegangsaan Dua - Velodrome, along 5.8 km[9]
Station Number Jakarta LRT S.svg Station Name Interchange/Notes City
Phase 1
S-01 Pegangsaan Dua Terminal station North Jakarta
S-02 Boulevard Utara
S-03 Boulevard Selatan
S-04 Pulomas Koridor 2 Transjakarta Koridor 2 Transjakarta K2-3 Pulomas

 M2  Kelapa Gading Timur (planned)

East Jakarta
S-05 Equestrian
S-06 Velodrome Terminus until the completion of Phase 2

Koridor 4 Transjakarta (4C) Koridor 4 Transjakarta (4H) (4K) (4M) (7M) K4-5 Pemuda Rawamangun

Bus Terminal Rawamangun Bus Terminal (via short walk)

Construction of Route 1 started on 22 June 2016. The first six kilometers of the route connecting the Kelapa Gading Depot to Velodrome Station was 29.61% complete by 26 June 2017. It was expected to be operational before the 2018 Asian Games.[10] However, this did not happen as construction is not yet finished and the Indonesia Asian Games Organizing Committee (INASGOC) considered that buses would be more effective in transporting the athletes.[11][12]

The test run for the LRT was initially scheduled for 10 August, however was delayed to 15 August 2018. Phase 1 was planned to begin operation in February, 2019.[13] After several delays, the line opened for free public trial run from July to late November 2019. Commercial operations began on 1 December 2019.[14][15]

Planned[]

As of 2020, the route of any future extensions remains in flux and construction has yet to start.[16] One proposed option is:

  • Jakarta LRT S.svg Phase 2A - Pegangsaan Dua - Jakarta International Stadium, along 7.5 km
  • Jakarta LRT S.svg Phase 2B - Velodrome - Klender[17]
  • Jakarta LRT S.svg Phase 3A - Jakarta International Stadium - Rajawali
  • Jakarta LRT S.svg Phase 3B - Klender - Halim[17]

Ticket and fare[]

LRT Jakarta begun collecting fares from 1 December 2019. On the entire system, passengers pay a flat fare of Rp 5.000.[18][19]

LRT Jakarta accept both cash and cashless payment. Cash payment are accepted to pay single trip tickets. Passengers must deposit of Rp 15.000 in addition to journey fare, which could be refunded within 7 days after last tapping out at exit gate.[20][21]

Cashless payment methods accepted are prepaid cards and electronic wallet. Prepaid cards accepted include e-money (Bank Mandiri), Flazz (Bank BCA), TapCash (Bank BNI), Brizzi (Bank BRI) Jakcard (Bank DKI), and Multi Trip Card (KAI Commuter). LRT Jakarta also accepts Jak Lingko-branded payment cards provided by Bank DKI, Bank Mandiri, Bank BRI, and Bank BNI. Fares are deducted from these prepaid cards upon exiting.[20][21] From 3 August 2020, LRT Jakarta accepts payment from electronic wallet. To date it only accepts wallets provided by LinkAja. Passengers only need to scan QR code at the entry gate to pay directly from their LinkAja e-wallet.[22]

See also[]

  • Greater Jakarta LRT
  • Jakarta MRT
  • Greater Jakarta Commuter Rail
  • Transport in Jakarta

References[]

  1. ^ a b c Ramadhan, Ardito (14 April 2018). "Ini Spesifikasi Kereta LRT yang Tiba di Jakarta". KOMPAS.com (in Indonesian). Retrieved 2 November 2018.
  2. ^ Fahd, Zacky (3 December 2017). "Eksklusif: Ini Dia Foto Sarana Kereta LRT Jakarta Kelapa Gading – Velodrome!". KAORI Nusantara (in Indonesian). Retrieved 2 November 2018.
  3. ^ "Rencana LRT di Jakarta". Kompas (in Indonesian). Jakarta. 11 September 2015. Archived from the original on 11 October 2015. Retrieved 21 September 2015.
  4. ^ "LRT Jakarta Fare to be Valid per December 1". Tempo. Retrieved 22 November 2019.
  5. ^ Eka, Aditya (13 September 2018). "Laporan Perjalanan: Inilah Kesan Pertama Kereta LRT Jakarta - KAORI Nusantara". KAORI Nusantara (in Indonesian). Retrieved 2 November 2018.
  6. ^ "Untuk Pembangunan Light Rail Transit (LRT) Jabodebek, BCA Kucurkan Kredit Sindikasi Rp2,78 Triliun". Okezone. 6 January 2018. Retrieved 10 January 2022.
  7. ^ "LRT Jakarta starts free public trial on Tuesday". 10 June 2019.
  8. ^ "Flagging LRT Jakarta to court passengers with expansion, promotions".
  9. ^ Media, Kompas Cyber (24 August 2018). "Kemenhub Lakukan Operasional Terbatas untuk LRT Kelapa Gading - Kompas.com". KOMPAS.com (in Indonesian). Retrieved 7 September 2018.
  10. ^ "In August 2018, Kelapa Gading-Rawamangun LRT to Commence Operation".
  11. ^ Wuragil, Zacharias (12 August 2018). "Duh, LRT Jakarta Akhirnya Gagal Ikut Asian Games". Tempo (in Indonesian). Retrieved 26 August 2018.
  12. ^ "LRT gagal beroperasi saat Asian Games Jakarta" (in Indonesian). Antara. 11 April 2018. Retrieved 26 August 2018.
  13. ^ Manurung, M Yusuf (15 August 2018). "Kantongi Izin dari Kemenhub, Hari Ini LRT Uji Operasi". Tempo (in Indonesian). Retrieved 26 August 2018.
  14. ^ Kartika, Mimi (3 June 2019). "Peresmian LRT Jakarta Diundur, Ini Penjelasan Anies". Republika Online. Republika Online. Retrieved 3 June 2019.
  15. ^ Agung Sandy Lesmana and Stephanus Aranditio (21 June 2019). "Skybridge Rampung, Stasiun LRT Velodrome Resmi Terintegrasi Halte Busway".
  16. ^ "Planned LRT Jakarta route change meets resistance".
  17. ^ a b Sulistyo, Bayu Tri (1 November 2020). "Tidak Jadi ke Manggarai, Trase LRT Jakarta Digeser ke Klender". Railway Enthusiast Digest (in Indonesian). Retrieved 27 March 2021.
  18. ^ Pahrevi, Dean (21 November 2019). "LRT Jakarta Dikomersilkan 1 Desember, Tarifnya Rp 5.000 Sekali Perjalanan". KOMPAS.com. Retrieved 16 August 2020.
  19. ^ Amali, Zakki (1 December 2019). "LRT Jakarta Resmi Berbayar 1 Desember, Tarif Rp5 Ribu Jauh-Dekat". tirto.id. Retrieved 16 August 2020.
  20. ^ a b Rahma, Athika (1 December 2019). "Resmi Berbayar, Ini Beragam Cara Beli Tiket LRT Jakarta". LIPUTAN 6. Retrieved 25 March 2020.
  21. ^ a b Setiyadi, Bima (2 December 2019). "Tiket LRT Jakarta Bisa Gunakan Seluruh Uang Elektronik". SINDONEWS.com. Retrieved 17 January 2021.
  22. ^ Catriana, Elsa (3 August 2020). "Bayar LRT Jakarta Bisa pakai LinkAja, Ini Promonya". KOMPAS.com. Retrieved 17 January 2021.

External links[]

Retrieved from ""