Toei Mita Line

From Wikipedia, the free encyclopedia
Mita Line
Toei Mita line symbol.svg
Toei-mita-line nisidai-hasune.jpg
A Toei 6300 series train at Hasune Station
Overview
OwnerToei Subway
LocaleTokyo
TerminiMeguro
Nishi-Takashimadaira
Stations27
Service
TypeRapid transit
Depot(s)Shimura
Rolling stockToei 6300 series, Tokyu 3000 series, Tokyu 5080 series
Daily ridership638,365 (2016)[1]
History
OpenedDecember 27, 1968
Technical
Line length26.5 km (16.5 mi)
Track gauge1,067 mm (3 ft 6 in)
Electrification1,500 V DC overhead catenary
Operating speed75 km/h (45 mph)
Route map
Toei Mita Line.png

The Toei Mita Line (都営地下鉄三田線, Toei Chikatetsu Mita-sen) is a subway line of the Tokyo Metropolitan Bureau of Transportation (Toei) network in Tokyo, Japan. The line runs between Nishi-Takashimadaira in Itabashi and Meguro in Shinagawa. Trains continue with direct service into the Meguro Line of Tokyu Corporation for Hiyoshi. The portion between Shirokane-Takanawa and Meguro is shared with the Tokyo Metro Namboku Line.

The line was named after the Mita district in Minato, Tokyo, under which it passes. On maps and signboards, the line is shown in blue (O). Stations carry the letter "I" followed by a two-digit number.

Overview[]

Platforms on the Mita Line are equipped with chest-height automatic platform gates that open in sync with the train doors. The line was the first in the Tokyo subway system to have low barriers. The Tokyo Metro Namboku Line has used full-height platform screen doors since its opening. As of May 2020, the platform doors are being overhauled for future 8 car operation.

The right-of-way and stations between Shirokane-Takanawa and Meguro are shared with the Tokyo Metro Namboku Line - a unique situation on the Tokyo subway where both operators share common infrastructure. Under an agreement of both parties, the fare for this section is calculated on the Toei system for passengers traveling to stations on the Mita Line past Shirokane-Takanawa, using the Tokyo Metro system for those travelling on the Namboku Line past Shirokane-Takanawa, and on the system "most beneficial to the passenger" (presently the Tokyo Metro schedule) for travel solely on the shared section.

According to the Tokyo Metropolitan Bureau of Transportation, as of June 2009 the Mita Line is the ninth most crowded subway line in Tokyo, running at 164%[a] capacity between Nishi-Sugamo and Sugamo stations.[2]

Blue subway-line diagram, listing stations
Line diagram

Station list[]

All stations are located in Tokyo.

No. Station Japanese Distance (km) Transfers Location
Between
stations
From I-01
I01 Meguro 目黒[* 1] - 0.0
Shinagawa
I02 Shirokanedai 白金台[* 2] 1.3 1.3 N Tokyo Metro Namboku Line (N-02) (shared) Minato
I03 Shirokane-takanawa 白金高輪[* 2] 1.0 2.3 N Tokyo Metro Namboku Line (N-03) (shared)
I04 Mita 三田 1.7 4.0
I05 Shibakoen 芝公園 0.6 4.6  
I06 Onarimon 御成門 0.7 5.3  
I07 Uchisaiwaicho 内幸町 1.1 6.4   Chiyoda
I08 Hibiya 日比谷 0.9 7.3
  • H Tokyo Metro Hibiya Line (H-08)
  • C Tokyo Metro Chiyoda Line (C-09)
  • Y Tokyo Metro Yurakucho Line (Yurakucho Station: Y-18)
  • JY Yamanote Line (Yūrakuchō Station)
  • Keihin-Tōhoku Line (Yūrakuchō Station)
  • Underground passage to Ginza and Higashi-ginza stations
I09 Ōtemachi 大手町 0.9 8.2
I10 Jimbocho 神保町 1.4 9.6
I11 Suidobashi 水道橋 1.0 10.6 JB Chūō-Sōbu Line Bunkyō
I12 Kasuga 春日 0.7 11.3
  • E Toei Oedo Line (E-07)
  • M Tokyo Metro Marunouchi Line (Korakuen Station: M-22)
  • N Tokyo Metro Namboku Line (Korakuen Station: N-11)
I13 Hakusan 白山 1.4 12.7  
I14 Sengoku 千石 1.0 13.7  
I15 Sugamo 巣鴨 0.9 14.6 JY Yamanote Line Toshima
I16 Nishi-sugamo 西巣鴨 1.4 16.0 Tokyo Sakura Tram (Shin-koshinzuka)
I17 Shin-itabashi 新板橋 1.0 17.0 JA Saikyō Line (Itabashi Station) Itabashi
I18 Itabashikuyakushomae 板橋区役所前 0.9 17.9  
I19 Itabashihoncho 板橋本町 1.2 19.1  
I20 Motohasunuma 本蓮沼 0.9 20.0  
I21 Shimura-sakaue 志村坂上 1.1 21.1  
I22 Shimura-sanchome 志村三丁目 0.9 22.0  
I23 Hasune 蓮根 1.2 23.2  
I24 Nishidai 西台 0.8 24.0  
I25 Takashimadaira 高島平 1.0 25.0  
I26 Shin-takashimadaira 新高島平 0.7 25.7  
I27 Nishi-takashimadaira 西高島平 0.8 26.5  
  1. ^ Meguro is shared by Toei, Tokyo Metro, and Tokyu Corporation; Tokyu Corporation manages the station.
  2. ^ Jump up to: a b Shirokanedai and Shirokane-Takanawa are shared by Toei and Tokyo Metro; Tokyo Metro manages both stations.

Rolling stock[]

6300 series (left and right) and Tokyu 5080 series (center) at Shimura depot

All trains are 6-car sets unless otherwise noted.

Present[]

Future[]

Past[]

6000 series between Shin-Takashimadaira and Nishi-Takashimadaira, February 1999

Maintenance facilities[]

  • Shimura Depot at Takashimadaira

History[]

The Mita Line was first envisioned in 1957 as a northern branch of Line 5 (the present Tōzai Line), serving the section between Ōtemachi and Itabashi. Under a revised proposal in 1962, the line was made independent and its construction undertaken by the Tokyo Metropolitan Government. The new line (Line 6) was planned to run from Gotanda Station on the southwestern side of the Yamanote Line through central Tokyo, with its northern extensions via Yamatochō (大和町) in Itabashi (near present Itabashi-honchō), diverting to Kami-Itabashi and Shimura (志村) (present Takashimadaira). The southernmost portion, from Sengakuji to Nishi-Magome and Nishi-Magome depot, was to be shared with Line 1 (Asakusa Line); therefore, Line 6 would be 1,435 mm (4 ft 8+12 in) gauge.

Due to political considerations, the design of the Mita Line changed several times during the early 1960s. There were plans for it to run to Toda, Saitama, to serve a boat-racing venue for the 1964 Summer Olympics. The government of Saitama also proposed the construction of a new subway line which would allow through service on the Mita Line as far as Ōmiya Station. In 1964, these plans were changed to allow the Mita Line to connect with the Tōbu Tōjō Line via a branch to be built by Tobu between Yamatomachi (大和町) (now Wakōshi), and Shimura, the northern end of Line 6. At the southern end the junction with the Tokyu network would be via a connecting line, which would be constructed by Tokyu from Sengakuji to Kirigaya (桐ヶ谷) on the Tōkyū Ikegami Line; the route would continue to the then-Den-en-toshi Line and finally west, down to Nagatsuta. As a result, the construction standards of Line 6 were based on those of Tobu and Tokyu (such as 1,067 mm (3 ft 6 in) gauge track and 20-meter-long cars - today, the Mita Line is the only Toei line to use this gauge). A depot was planned at Shimura, independent of the Nishi-Magome depot on Line 1.

However, both Tokyu and Tobu decided the following year to operate their through services with the Teito Rapid Transit Authority (TRTA, now Tokyo Metro) lines instead. With no through service opportunities available the Tokyo Metropolitan Government began construction on the central portion of the line, leaving the plans for the Itabashi and Mita ends open for future development. This required an extension somewhere south of Seishōkō-mae (清正公前) (present Shirokane-Takanawa), probably to the then-Mekama Line of Tokyu (on the commencement of inter running to Mita and Namboku lines, the Mekama Line was divided into the Meguro Line and Tōkyū Tamagawa Line) which competed with TRTA Line 7, later called the Tokyo Metro Namboku Line.

The first segment of the line opened on December 27, 1968, between Sugamo and Takashimadaira (10.4 km). The line was extended a further 7.3 km south to Hibiya on June 30, 1972 and 3.3 km further south to Mita on November 27, 1973. The northern 1.5 km extension (originally licensed to Tobu and later transferred to the Tokyo government bureau of transportation) was completed on May 6, 1976. For the next 24 years, the line operated between Mita and Nishi-Takashimadaira; the authorized Mita and Sengakuji section had been left uncompleted.

In 1985 the then-Ministry of Transport finally settled the plan regarding the southern extension of the line, and shelved all plans for further extension to the north due to the development of the Saikyō Line. On September 26, 2000, the final 4 km segment from Mita to Meguro opened, and through service to the Meguro Line of Tokyu began at the same time, at which point the line switched to driver-only operation.

Notes[]

a. ^ Crowding levels defined by the Ministry of Land, Infrastructure, Transport and Tourism:[3][4]

100% — Commuters have enough personal space and are able to take a seat or stand while holding onto the straps or hand rails.
150% — Commuters have enough personal space to read a newspaper.
180% — Commuters must fold newspapers to read.
200% — Commuters are pressed against each other in each compartment but can still read small magazines.
250% — Commuters are pressed against each other, unable to move.

References[]

  1. ^ 東京都交通局ホーム - 経営情報 - 交通局の概要 - 都営地下鉄 [Tokyo Metropolitan Bureau of Transportation Home - Management Information - Overview of the Department of Transportation - Toei Subway] (in Japanese). 東京都交通局 [Tokyo Metropolitan Bureau of Transportation]. April 1, 2015. Retrieved 2016-01-17.
  2. ^ Metropolis, "Commute", June 12, 2009, p. 07. Capacity is defined as all passengers having a seat or a strap or door railing to hold on to.
  3. ^ "混雑率の推移".
  4. ^ Kikuchi, Daisuke (6 July 2017). "Tokyo plans new effort to ease commuter hell on rush-hour trains". The Japan Times. Archived from the original on 6 July 2017.

External links[]

Retrieved from ""