China Railway CR200J
This article needs to be updated.(May 2021) |
CR200J EMU | |
---|---|
Manufacturer | CRRC Nanjing Puzhen CRRC Qingdao Sifang CRRC Tangshan CRRC Zhuzhou Locomotive CRRC Datong CRRC Dalian |
Family name | Fuxing |
Constructed | 2017-present |
Entered service | January 2019 |
Number built | 144 sets (101 short, 40 long) 195 power cars, 1483 trailer cars |
Formation |
|
Capacity |
|
Operator(s) | China Railway |
Specifications | |
Train length |
|
Car length |
|
Width | 3,105 mm (10 ft 2.2 in) |
Height | 4,433 mm (14 ft 6.5 in) |
Wheelbase | 2,800 mm (9 ft 2 in) |
Maximum speed | 210 km/h (130 mph) |
Weight | 445t (7T formation) 1164t (16T formation) |
Traction system | CRRC Times Electric IGBT Water-cooled VVVF (FXD1) Toshiba Corporation-Dalian Vehicles -VVVF (FXD3, VVVF manufactured by ) |
Traction motors | CRRC Zhuzhou Electric Machine Permanent Magnet Motor (PMSM) MD-39 (FXD1) CRRC Yongji Electric Machine Open Internal Sector Three-phase Induction Motor YJ-277B / C (FXD3, authorized by Toshiba Corporation) |
Power output | Powercars: 5,600 kW (7,500 hp) |
Electric system(s) | 25 kV 50 Hz AC Overhead lines |
Bogies | Bolsterless air spring: SW-220K (Tangshan-made trailer) CL-242K (Puzhen-made trailer) |
Braking system(s) | Regenerative braking, electro-pneumatic composite braking system |
Safety system(s) | CTCS2-200H/C |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
Notes | |
[1][2] |
The CR200J Fuxing (Chinese: 复兴号; pinyin: Fùxīng Hào "Rejuvenation") is a Chinese higher-speed trainset consisting of a power car paired with unpowered passenger cars operated by China Railway. It is the slowest member of the Fuxing series.[3] The train was jointly designed and produced by six companies under CRRC.
These units are nicknamed Green EMUs[4] or Hulk by the Chinese media due to its appearance.[5]
Design and development[]
The development of CR200J is initiated by China Railway Corporation to create an affordable, economical, efficient higher-speed rail. The development started on 28 August 2015. First prototype started testing on 27 April 2017. Multiple trainset was sent to China Railway Chengdu Group for dynamic test on Chengdu–Chongqing railway, Chongqing–Lanzhou railway, and Chongqing–Guiyang high-speed railway between 17 December 2017 and 4 January 2018.[6] There're multiple variants of CR200J series made by different subsidiaries of the state-owned China Railway, and these variants are required to follow the China Standardized EMU design philosophy, thus ensuring every variants of CR200J can be compatible to each other. Another round of testing was finished on 5 August 2018.[7] On 5 January 2019, China Railway announced several new service lines, and CR200J was formally put into service.[8]
CR200J shares similar transmission and motor system with other Fuxing series trainset despite the lower operating speed.[9][10] All CR200J trainset is painted in green colors, reminiscent of China's pervious generation green-skinned train.[11] The interior design follows the design language of CR400 Fuxing EMU trains, and it's fitted with individual power outlet, Wi-Fi connection, and larger legroom.[12]
Variant[]
- FXD1-J:Electric locomotive manufactured by CRRC Zhuzhou Locomotive and CRRC Datong.
- FXD3-J:Electric locomotive manufactured by CRRC Dalian.
- HXD1D-J:Electro-diesel (bi-mode) locomotive manufactured by CRRC Zhuzhou Locomotive for plateau operation.
- FXN3-J:Electro-diesel (bi-mode) locomotive manufactured by CRRC Dalian for plateau operation.
- : Specially designed 25T coaches with driver-controlled doors.
Equipment issues[]
In the initial operation period, the CR200J variant manufactured by CRRC Dalian had a high rate of failure. A malfunction in the engine system caused the train to slow down and stop. Out of the 23 EMUs produced by CRRC Dalian, 12 of them have broken down before 1 June 2019. According to a China Business Journal, the maintenance department of the manufacturer was held accountable for the failures. In response, CRRC Dalian cut salaries by 20 percent and recalled their trainset for repair and upgrade.[13]
Gallery[]
First class interior
CR200J second class seats
Second class interior
The table seats located at the center of second class cars
Washbasin and automatic door
CR200J Second class sleeper
CR200J sleeper train at Beijing South railway station
CR200J trainset at Dongguan East railway station
Lao Railways CR200J for service on the Boten–Vientiane railway
See also[]
References[]
- ^ "中国动车组-复兴号CR200J型电力动车组". china-emu.cn. Archived from the original on 2018-03-23. Retrieved 2018-03-12.
- ^ "时速160公里动力集中动车组动力车_产品中心_机车_中车大连机车车辆有限公司". www.crrcgc.cc.
- ^ "Three New Types of Fuxing Bullet Trains Unveiled_Media_news Details_CRRC". www.crrcgc.cc. Retrieved 2020-06-10.
- ^ "好消息!西安-旬阳6日起开行"绿动车" 运行时间2小时左右 - 西部网(陕西新闻网)". www.cnwest.com (in Chinese). Retrieved 2020-12-04.
- ^ 新华网-张晨霖. "探访时速160公里动力集中动车组"绿巨人"" (in Chinese).
- ^ "CR200J动力集中型动车组,已经到成都铁路局开展实验-北京瑞威铁科高铁技术有限公司 江西瑞威铁科铁路工程有限公司". www.rw-tk.com (in Chinese).
- ^ "高楼迷论坛-首列CR200J动力集中型动车组抵达兰州西站开展实验". gaoloumi.com. Archived from the original on 2018-04-05. Retrieved 2018-04-04.
- ^ 新华网-张晨霖. "探访时速160公里动力集中动车组"绿巨人"".
- ^ "时速160公里动力集中动车组动力车". 中车大连机车.
- ^ 蔡杰;陈湘;李自然;黄庆;高峻 (2017). "新型动力集中动车组DC 600V列车供电装置". 机车电传动 (05): 44–47. doi:10.13890/j.issn.1000-128x.2017.05.011. ISSN 1000-128X. Retrieved 2019-04-29.
- ^ "探营复兴号新型动车组:色彩谱系更丰富,超长列车拟下月投用". 澎湃新闻. 2018-12-24.
- ^ "5月1日起,开化站始发"绿巨人"动车组列车" (in Chinese). 衢州新闻网. 2019-04-21.
- ^ Chan, D. M. (2019-07-05). "Salaries cut 20% as train builder's failure rate higher than 90%". Asia Times (in American English). Retrieved 2021-03-05.
- CRRC multiple units
- High-speed trains of China