Weifang–Yantai high-speed railway
Weifang–Yantai high-speed railway 潍烟高速铁路 | |
---|---|
Overview | |
Status | Under construction |
Locale | Weifang Yantai |
Termini | Weifang North Yantai South |
Stations | 11 |
Service | |
Operator(s) | China Railway High-speed |
Technical | |
Line length | 236 km (147 mi) |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
The Weifang–Yantai high speed railway is a high speed line between Weifang and Yantai in China.
History[]
The railway was approved on 29 June 2020.[1] Construction on the railway officially began on 31 October.[2] It is expected to take four years.[3]
Route[]
The line is shared with the Weifang–Laixi high-speed railway between Weifang North and Changyi. It will have the following stations:
References[]
- ^ "潍烟铁路获山东省发改委批复立项,总投资524亿元_中国政库_澎湃新闻-The Paper". www.thepaper.cn. Retrieved 2020-11-07.
- ^ "山东两条高铁同日开工建设 - 建设 - 人民铁道网 - 中国铁路新闻门户". www.peoplerail.com. Retrieved 2020-11-07.
- ^ "新进展!潍烟铁路全线首孔箱梁浇筑完成" [New developments! The first hole box beams of the whole line of the Weifang-Yantai railway were poured]. 半岛网. 23 February 2021. Retrieved 24 February 2021.