Marble Hill–225th Street station
Marble Hill–225 Street | |||
---|---|---|---|
New York City Subway station (rapid transit) | |||
Station statistics | |||
Address | West 225th Street & Broadway New York, NY 10463 | ||
Borough | Manhattan | ||
Locale | Marble Hill | ||
Coordinates | 40°52′26″N 73°54′36″W / 40.874°N 73.91°WCoordinates: 40°52′26″N 73°54′36″W / 40.874°N 73.91°W | ||
Division | A (IRT)[1] | ||
Line | IRT Broadway–Seventh Avenue Line | ||
Services | 1 (all times) | ||
Transit | NYCT Bus: Bx7, Bx9, Bx20 Metro-North: Hudson Line (at Marble Hill) | ||
Structure | Elevated | ||
Platforms | 2 side platforms | ||
Tracks | 3 (2 in regular service) | ||
Other information | |||
Opened | January 14, 1907 | ||
Station code | 296[2] | ||
Opposite- direction transfer | No | ||
Traffic | |||
2019 | 1,561,844[4] 7.4% | ||
Rank | 287 out of 424[4] | ||
Station succession | |||
Next north | 231st Street: 1 | ||
Next south | 215th Street: 1 221st Street: no regular service (demolished) | ||
| |||
| |||
| |||
|
Marble Hill–225th Street (signed 225th Street) is a local station on the IRT Broadway–Seventh Avenue Line of the New York City Subway. Located at the intersection of Broadway and 225th Street in Marble Hill, Manhattan, it is served by the 1 train at all times.
History[]
The West Side Branch of the original subway line was extended to 225th Street on January 14, 1907, the structure of the 221st Street station was dismantled and was moved to 230th Street for a new temporary terminus.[5] This station stopped being the terminal of the line, when on January 27, 1907, the line was extended to the new temporary terminal at 230th Street.
To address overcrowding, in 1909, the New York Public Service Commission proposed lengthening platforms at stations along the original IRT subway.[6]: 168 As part of a modification to the IRT's construction contracts, made on January 18, 1910, the company was to lengthen station platforms to accommodate ten-car express and six-car local trains. In addition to $1.5 million (equivalent to $41.7 million in 2020) spent on platform lengthening, $500,000 (equivalent to $13,887,500 in 2020) was spent on building additional entrances and exits. It was anticipated that these improvements would increase capacity by 25 percent.[7]: 15 The northbound platform at the 225th Street station was extended 95 feet (29 m) to the north.[7]: 114 The southbound platform was not lengthened.[7]: 106 On January 24, 1911, ten-car express trains began running on the West Side Line.[6]: 168 [8] Subsequently, the station could accommodate six-car local trains, but ten-car trains could not open some of their doors.[9]
In Fiscal Year 1924, an additional stairway was constructed to the northbound platform to accommodate additional ridership from the New York Velodrome.[10]
Platforms at IRT Broadway–Seventh Avenue Line stations between 103rd Street and 238th Street, including those at 225th Street, were lengthened to 514 feet (157 m) between 1946 and 1948, allowing full ten-car express trains to stop at these stations.[9] A contract for the platform extensions at 225th Street and five other stations on the line was awarded to the Rao Electrical Equipment Company and the Kaplan Electric Company in June 1946.[11] The platform extensions at these stations were opened in stages. On July 9, 1948, the platform extensions at stations between 207th Street and 238th Street, including the 225th Street station, were opened for use at the cost of $423,000.[9][12] At the same time, the IRT routes were given numbered designations with the introduction of "R-type" rolling stock, which contained rollsigns with numbered designations for each service. The first such fleet, the R12, was put into service in 1948.[13] The route to 242nd Street became known as the 1.[14]
From August 21, 1989 to May 27, 2005 this was one of three (originally four) stations served by only the 9 train during rush hours (as well as middays before September 4, 1994), when skip stop service was operating. 1 trains served the station at all other times when the 9 was not operating. Skip-stop service as well as the 9 train were discontinued on May 29, 2005, at which point the 1 train began stopping at the station at all times.
Station layout[]
P Platform level |
Side platform | |
Northbound local | ← toward 242nd Street (231st Street) | |
Peak-direction express | No regular service | |
Southbound local | toward South Ferry (215th Street) → | |
Side platform | ||
M | Mezzanine | Fare control, station agent, MetroCard machines |
G | Street level | Entrances/exits |
This elevated station has three tracks and two side platforms. The center track is not used in revenue service.[15] The southern half of the platforms has beige windscreens and red canopies with green frames and support columns while the northern half has black, steel, waist high fences and lampposts. The station signs are in the standard black name plates in white lettering.
The 1991 artwork here, by Wopo Holup, is called Elevated Nature I-IV. Portions are also located at four other stations on this line.
Marble Hill–225th Street is the northernmost subway station in Manhattan, and is one of two subway stations in Manhattan that are not located on Manhattan Island itself, the other one being Roosevelt Island on the F and <F> trains.
Exits[]
All fare control areas are at platform level and there are no crossovers or crossunders. Both platforms have a station house, but only the southbound one is active. It has a turnstile bank, token booth, and one staircase going down to 225th Street and the northwest corner of Broadway. Access to and from the northbound platform is via two full-height turnstiles, one exit-only and the other entry-exit, and one staircase going down to the east side of Broadway across from the northwest corner of 225th Street.[16]
Location[]
This station is less than 0.2 miles (0.32 km) from the Marble Hill station on Metro-North Railroad's Hudson Line. Just south of the station, the IRT Broadway–Seventh Avenue Line crosses the Broadway Bridge onto the island of Manhattan.
This station today and the neighborhood it serves reside on the north shore of the Harlem River Ship Canal, also known as Spuyten Duyvil Creek, and are thus geographically on the mainland. However, the neighborhood was formerly part of the island of Manhattan. The canal was constructed in 1895, separating the neighborhood from the rest of the island. After the original creek bed was filled in, Marble Hill became part of the mainland, although it is still considered part of Manhattan for administrative and political purposes.[note 1][17]
Notes[]
- ^ See Manhattan for an explanation of the distinction between island of Manhattan and the borough of Manhattan, a political entity consisting of the island of Manhattan, several other islands, and the Marble Hill neighborhood on the mainland.
References[]
- ^ "Glossary". Second Avenue Subway Supplemental Draft Environmental Impact Statement (SDEIS) (PDF). 1. Metropolitan Transportation Authority. March 4, 2003. pp. 1–2. Archived from the original (PDF) on February 26, 2021. Retrieved January 1, 2021.
- ^ "Station Developers' Information". Metropolitan Transportation Authority. Retrieved June 13, 2017.
- ^ "Facts and Figures: Annual Subway Ridership 2014–2019". Metropolitan Transportation Authority. 2020. Retrieved May 26, 2020.
- ^ Jump up to: a b "Facts and Figures: Annual Subway Ridership 2014–2019". Metropolitan Transportation Authority. 2020. Retrieved May 26, 2020.
- ^ "Farthest North In Town By The Interborough: Take a Trip to the New Station, 225th Street West" (PDF). New York Times. January 14, 1907. Retrieved August 16, 2015.
- ^ Jump up to: a b Hood, Clifton (1978). "The Impact of the IRT in New York City" (PDF). Historic American Engineering Record. pp. 146–207 (PDF pp. 147–208). Retrieved December 20, 2020. This article incorporates text from this source, which is in the public domain.CS1 maint: postscript (link)
- ^ Jump up to: a b c Report of the Public Service Commission for the First District of the State of New York For The Year Ending December 31, 1910. Public Service Commission. 1911.
- ^ "Ten-car Trains in Subway to-day; New Service Begins on Lenox Av. Line and Will Be Extended to Broadway To-morrow". The New York Times. January 23, 1911. ISSN 0362-4331. Retrieved April 5, 2018.
- ^ Jump up to: a b c Report for the three and one-half years ending June 30, 1949. New York City Board of Transportation. 1949. hdl:2027/mdp.39015023094926.
- ^ 1923-1924 Annual Report of the Interborough Rapid Transit Company For The Year Ended June 30, 1924. Interborough Rapid Transit Company. 1924. p. 13.
- ^ "Platform Awards Made; Two Concerns to Enlarge Six Subway Stations of IRT" (PDF). The New York Times. June 14, 1946. p. 23. ISSN 0362-4331. Retrieved January 27, 2021.
- ^ "More Long Platforms – Five Subway Stations on IRT to Accommodate 10-Car Trains" (PDF). The New York Times. July 10, 1948. p. 8. ISSN 0362-4331. Retrieved March 27, 2016.
- ^ Brown, Nicole (May 17, 2019). "How did the MTA subway lines get their letter or number? NYCurious". amNewYork. Retrieved January 27, 2021.
- ^ Friedlander, Alex; Lonto, Arthur; Raudenbush, Henry (April 1960). "A Summary of Services on the IRT Division, NYCTA" (PDF). New York Division Bulletin. Electric Railroaders' Association. 3 (1): 2.
- ^ Dougherty, Peter (2006) [2002]. Tracks of the New York City Subway 2006 (3rd ed.). Dougherty. OCLC 49777633 – via Google Books.
- ^ "MTA Neighborhood Maps: Riverdale" (PDF). mta.info. Metropolitan Transportation Authority. 2015. Retrieved September 15, 2015.
- ^ Tax Block & Tax Lot Base Map Files on CD-ROM Archived August 5, 2007, at the Wayback Machine, New York City Department of City Planning. Accessed July 26, 2007. "Marble Hill is a neighborhood that is part of the borough of Manhattan but is administratively often included with neighboring areas of the Bronx. Parts of Marble Hill are within Bronx Community District 7; the rest is within Bronx Community District 8."
External links[]
Wikimedia Commons has media related to Marble Hill – 225th Street (IRT Broadway – Seventh Avenue Line). |
- nycsubway.org – IRT West Side: 225th Street
- Station Reporter – 1 Train
- The Subway Nut – Marble Hill–225th Street Pictures
- 225th Street (North) entrance from Google Maps Street View
- 225th Street (South) entrance from Google Maps Street View
- Platforms from Google Maps Street View
- IRT Broadway–Seventh Avenue Line stations
- Broadway (Manhattan)
- U.S. Route 9
- New York City Subway stations in Manhattan
- New York City Subway stations located aboveground
- Railway stations in the United States opened in 1907
- 1907 establishments in New York (state)
- Marble Hill, Manhattan